科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
Y
Yeong‐Dae Kim
university of colorado
36
H指数
144
论文数
3.5K
被引数
0
相关解读
订阅
收录论文
56
发表时间
发表时间
IF
被引数
Comparing vibrotactile stimulation to combined visual and auditory stimulation for 40 Hz gamma entrainment
比较振动触觉刺激与结合视觉和听觉刺激用于40 Hz伽马波同步引导
Scientific Reports
IF
3.9
2026-07-10
0
OA
AI
Yeongdae Kim; Ayush Choudhary; Hyeonseok Kim; Peter Teale; Brice McConnell; Mazen Al Borno
分享
收藏
Stereoscopic objects affect reaching performance in virtual reality environments: influence of age on motor control
FRONTIERS IN VIRTUAL REALITY
IF
3.6
2024-11-06
3
OA
AI
Kim, Hyeonseok; Kim, Yeongdae; Lee, Jongho; Kim, Jaehyo
分享
收藏
Electroencephalography Reflects User Satisfaction in Controlling Robot Hand through Electromyographic Signals
SENSORS
IF
3.5
2022-12-27
7
OA
AI
Kim, Hyeonseok; Miyakoshi, Makoto; Kim, Yeongdae; Stapornchaisit, Sorawit; Yoshimura, Natsue; Koike, Yasuharu
分享
收藏
Brain Activity Reflects Subjective Response to Delayed Input When Using an Electromyography-Controlled Robot
FRONTIERS IN SYSTEMS NEUROSCIENCE
IF
3.5
2021-11-29
5
OA
AI
Kim, Hyeonseok; Kim, Yeongdae; Miyakoshi, Makoto; Stapornchaisit, Sorawit; Yoshimura, Natsue; Koike, Yasuharu
分享
收藏
The Effect of ICA and Non-negative Matrix Factorization Analysis for EMG Signals Recorded From Multi-Channel EMG Sensors
FRONTIERS IN NEUROSCIENCE
IF
3.2
2020-12-01
6
OA
AI
Kim, Yeongdae; Stapornchaisit, Sorawit; Miyakoshi, Makoto; Yoshimura, Natsue; Koike, Yasuharu
分享
收藏
Production planning in a two-level supply chain for production-time-dependent products with dynamic demands
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2019-09-01
6
PRE
AI
Han, Jun-Hee; Lee, Ju-Yong; Kim, Yeong-Da
分享
收藏
Algorithms for a two-machine flowshop problem with jobs of two classes
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
IF
2.9
2018-03-23
7
PRE
AI
Jeong, BongJoo; Kim, Yeong-Dae; Shim, Sang-Oh
分享
收藏
Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2017-12-01
12
PRE
AI
Lee, Ju-Yong; Kim, Yeong-Dae
分享
收藏
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2016-07-01
37
PRE
AI
An, Young-Jin; Kim, Yeong-Dae; Choi, Seong-Woo
分享
收藏
Design and operation of a two-level supply chain for production-time-dependent products using Lagrangian relaxation
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2016-06-01
9
PRE
AI
Han, Jun-Hee; Kim, Yeong-Dae
分享
收藏
Finding a risk-constrained shortest path for an unmanned combat vehicle
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2015-02-01
14
PRE
AI
Bae, Kyung-Yeol; Kim, Yeong-Dae; Han, Jun-Hee
分享
收藏
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2014-07-01
18
PRE
AI
Jeong, BongJoo; Kim, Yeong-Dae
分享
收藏
Multiple-criterion shortest path algorithms for global path planning of unmanned combat vehicles
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2014-05-01
31
PRE
AI
Han, Du-Hyun; Kim, Yeong-Dae; Lee, Ju-Yong
分享
收藏
A Lagrangian heuristic algorithm for a public healthcare facility location problem
公共医疗设施选址问题的拉格朗日启发式算法
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2013-04-19
29
PRE
AI
Kim, Dong-Guen; Kim, Yeong-Dae
分享
收藏
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance
在具有定期维护的单机调度问题中最小化迟到作业的数量
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2012-09-01
50
PRE
AI
Lee, Ju-Yong; Kim, Yeong-Dae
分享
收藏
Heuristics for determining a patrol path of an unmanned combat vehicle
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2012-08-01
23
PRE
AI
Park, Chul-Hwan; Kim, Yeong-Dae; Jeong, BongJoo
分享
收藏
Inventory control in a two-level supply chain with risk pooling effect
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2012-01-01
42
PRE
AI
Kang, Jae-Hun; Kim, Yeong-Dae
分享
收藏
Heuristic algorithms for assigning and scheduling flight missions in a military aviation unit
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2011-11-01
6
PRE
AI
Kim, Bong-Kyun; Kim, Yeong-Dae
分享
收藏
Scheduling algorithms for a semiconductor probing facility
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2011-03-01
19
PRE
AI
Bang, June-Young; Kim, Yeong-Dae
分享
收藏
Layout planning for facilities with fixed shapes and input and output points
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2010-11-14
65
PRE
AI
Kim, JG; Kim, YD
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
C
Chulhwan Park
H 指数: 49 · 论文数: 397
J
Jae Sung Lee
H 指数: 48 · 论文数: 211
K
Kyung Hee Lee
H 指数: 42 · 论文数: 418
D
Dong-Ho Lee
H 指数: 37 · 论文数: 431
Y
Yasuharu Koike
H 指数: 34 · 论文数: 347
查看更多