科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
J
Julien Fondrevelle
Universite Claude Bernard Lyon 1
10
H指数
63
论文数
530
被引数
0
相关解读
订阅
收录论文
12
发表时间
发表时间
IF
被引数
Surgery scheduling based on large language models
基于大型语言模型的手术排程
ARTIFICIAL INTELLIGENCE IN MEDICINE
IF
6.2
2025-05-28
0
PRE
AI
Wan, Fang; Wang, Tao; Wang, Kezhi; Si, Yuanhang; Fondrevelle, Julien; Du, Shuimiao; Duclos, Antoine
分享
收藏
Enhancing healthcare resource allocation through large language models
通过大型语言模型增强医疗资源分配
SWARM AND EVOLUTIONARY COMPUTATION
IF
8.5
2025-04-01
0
PRE
AI
Wan, Fang; Wang, Kezhi; Wang, Tao; Qin, Hu; Fondrevelle, Julien; Duclos, Antoine
分享
收藏
Collaborative optimization of surgery and ICU under uncertainty
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2024-06-01
0
PRE
AI
Wan, Fang; Wang, Tao; Fondrevelle, Julien; Duclos, Antoine
分享
收藏
Length of Stay Prediction With Standardized Hospital Data From Acute and Emergency Care Using a Deep Neural Network
MEDICAL CARE
IF
2.8
2024-02-12
2
PRE
AI
Lequertier, Vincent; Wang, Tao; Fondrevelle, Julien; Augusto, Vincent; Polazzi, Stephanie; Duclos, Antoine
分享
收藏
Two-stage multi-objective optimization for ICU bed allocation under multiple sources of uncertainty
SCIENTIFIC REPORTS
IF
3.9
2023-11-02
2
OA
AI
Wan, Fang; Fondrevelle, Julien; Wang, Tao; Duclos, Antoine
分享
收藏
Hospital Length of Stay Prediction Methods A Systematic Review
MEDICAL CARE
IF
2.8
2021-07-26
24
PRE
AI
Lequertier, Vincent; Wang, Tao; Fondrevelle, Julien; Augusto, Vincent; Duclos, Antoine
分享
收藏
Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2021-01-17
2
OA
AI
Doan, M. P.; Fondrevelle, J.; Botta-Genoulaz, V; Ribeiro, J. F. F.
分享
收藏
Job-shop production scheduling with reverse flows
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2015-07-01
15
PRE
AI
Abdeljaouad, Mohamed Amine; Bahroun, Zied; Omrane, Anissa; Fondrevelle, Julien
分享
收藏
An integrated approach for sustainable supply chain planning
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2015-02-01
144
PRE
AI
Boukherroub, Tasseda; Ruiz, Angel; Guinet, Alain; Fondrevelle, Julien
分享
收藏
Permutation flow shops with exact time lags to minimise maximum lateness
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2009-10-13
13
OA
AI
Fondrevelle, J.; Oulamara, A.; Portmann, M. -C.; Allahverdi, A.
分享
收藏
Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion times
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2008-03-01
19
PRE
AI
Fondrevelle, J.; Oulamara, A.; Portmann, M. -C.
分享
收藏
Permutation flowshop scheduling problems with maximal and minimal time lags
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2006-06-01
55
PRE
AI
Fondrevelle, J; Oulamara, A; Portmann, MC
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
K
Kezhi Wang
H 指数: 56 · 论文数: 408
A
Ali Allahverdi
H 指数: 50 · 论文数: 244
A
Antoine Duclos
H 指数: 34 · 论文数: 314
Á
Ángel Ruiz
H 指数: 29 · 论文数: 192
王涛
(Tao Wang)
H 指数: 24 · 论文数: 213
查看更多