科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
C
Ching‐Jong Liao
national taiwan university of science & technology
33
H指数
103
论文数
4.4K
被引数
0
相关解读
订阅
收录论文
52
发表时间
发表时间
IF
被引数
Two new approaches for a two-stage hybrid flowshop problem with a single batch processing machine under waiting time constraint
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2017-11-01
33
PRE
AI
Chung, Tsui-Ping; Sun, Heng; Liao, Ching-Jong
分享
收藏
Toward sustainability: using big data to explore the decisive attributes of supply chain risks and uncertainties
JOURNAL OF CLEANER PRODUCTION
IF
10
2017-01-01
188
OA
AI
Wu, Kuo-Jui; Liao, Ching-Jong; Tseng, Ming-Lang; Lim, Ming K.; Hu, Jiayao; Tan, Kimhua
分享
收藏
Exploring eco-innovation in dynamic organizational capability under incomplete information in the Taiwanese lighting industry
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2016-11-01
44
PRE
AI
Wu, Kuo-Jui; Liao, Ching-Jong; Chen, Chih-Cheng; Lin, Yuanhsu; Tsai, Chuck F. M.
分享
收藏
Multi-attribute approach to sustainable supply chain management under uncertainty
不确定环境下可持续供应链管理的多属性方法
INDUSTRIAL MANAGEMENT & DATA SYSTEMS
IF
4.7
2016-05-09
89
PRE
AI
Wu, Kuo-Jui; Liao, Ching-Jong; Tseng, MingLang; Chiu, Kevin Kuan-Shun
分享
收藏
Scheduling with multi-attribute set-up times on unrelated parallel machines
在不相关的并行机上进行多属性设置时间的调度
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2015-11-25
11
PRE
AI
Liao, Ching-Jong; Lee, Cheng-Hsiung; Tsai, Hsing-Tzu
分享
收藏
Understanding Innovation for Sustainable Business Management Capabilities and Competencies under Uncertainty
SUSTAINABILITY
IF
3.3
2015-10-12
42
OA
AI
Wu, Kuo-Jui; Liao, Ching-Jong; Tseng, Ming-Lang; Chou, Pei-Jay
分享
收藏
An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2015-10-01
55
PRE
AI
Liao, Ching-Jong; Lee, Cheng-Hsiung; Lee, Hong-Chieh
分享
收藏
Exploring decisive factors in green supply chain practices under uncertainty
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2015-01-01
119
PRE
AI
Wu, Kuo-Jui; Liao, Ching-Jong; Tseng, Ming-Lang; Chiu, Anthony S. F.
分享
收藏
A comparison of five hybrid metaheuristic algorithms for unrelated parallel-machine scheduling and inbound trucks sequencing in multi-door cross docking systems
APPLIED SOFT COMPUTING
IF
6.6
2014-08-01
36
PRE
AI
Liao, T. W.; Chang, P. C.; Kuo, R. J.; Liao, C. -J.
分享
收藏
Unrelated parallel machine scheduling with dedicated machines and common deadline
具有专用机器和共同截止日期的不相关并行机器调度
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2014-08-01
12
PRE
AI
Lee, Cheng-Hsiung; Liao, Ching-Jong; Chao, Chien-Wen
分享
收藏
Risk management for outsourcing biomedical waste disposal - Using the failure mode and effects analysis
WASTE MANAGEMENT
IF
7.1
2014-07-01
28
PRE
AI
Liao, Ching-Jong; Ho, Chao Chung
分享
收藏
Scheduling with multi-attribute setup times on two identical parallel machines
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2014-07-01
6
PRE
AI
Lee, Cheng-Hsiung; Liao, Ching-Jong; Chung, Tsui-Ping
分享
收藏
An immunoglobulin-based artificial immune system for solving the hybrid flow shop problem
APPLIED SOFT COMPUTING
IF
6.6
2013-08-01
28
PRE
AI
Chung, Tsui-Ping; Liao, Ching-Jong
分享
收藏
Batch scheduling problem for a machinery factory with fixed-position layout
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2013-02-01
10
PRE
AI
Lin, Rock; Liao, Ching-Jong
分享
收藏
Meta-heuristics for manufacturing scheduling and logistics problems
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2013-01-01
5
PRE
AI
Liao, Ching-Jong; Gen, Mitsuo; Tiwari, Manoj Kumar; Chang, Pei-Chann
分享
收藏
A case study of batch scheduling for an assembly shop
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2012-10-01
19
PRE
AI
Lin, Rock; Liao, Ching-Jong
分享
收藏
A discrete electromagnetism-like mechanism for single machine total weighted tardiness problem with sequence-dependent setup times
APPLIED SOFT COMPUTING
IF
6.6
2012-09-01
15
PRE
AI
Chao, Chien-Wen; Liao, Ching-Jong
分享
收藏
Scheduling with multi-attribute setup times
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2012-09-01
14
PRE
AI
Lee, Cheng-Hsiung; Liao, Ching-Jong; Chao, Chien-Wen
分享
收藏
An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem
APPLIED SOFT COMPUTING
IF
6.6
2012-06-01
120
PRE
AI
Liao, Ching-Jong; Tjandradjaja, Evi; Chung, Tsui-Ping
分享
收藏
An ant colony optimization algorithm for setup coordination in a two-stage production system
APPLIED SOFT COMPUTING
IF
6.6
2011-12-01
20
PRE
AI
Liao, Ching-Jong; Tsai, Yu-Lun; Chao, Chien-Wen
分享
收藏
研究方向
暂无研究方向
合作学者
合作期刊
M
Ming‐Lang Tseng
H 指数: 91 · 论文数: 536
M
Manoj Kumar Tiwari
H 指数: 72 · 论文数: 591
M
Ming K. Lim
H 指数: 71 · 论文数: 483
M
Mitsuo Gen
H 指数: 70 · 论文数: 617
K
Kim Hua Tan
H 指数: 59 · 论文数: 289
查看更多