arrow
返回
S

Shuenn‐Ren Cheng

Cheng Shiu University

25H指数
99论文数
1.5K被引数
收录论文 30
发表时间
Several variants of simulated annealing hyper-heuristic for a single-machine scheduling with two-scenario-based dependent processing times
err2021-02-01
err37
PREAI
errWu, Chin-Chia; Bai, Danyu; Chen, Juin-Han; Lin, Win-Chin; Xing, Lining; Lin, Jia-Cheng; Cheng, Shuenn-Ren
err分享
err收藏
A robust customer order scheduling problem along with scenario-dependent component processing times and due dates
err2021-01-01
err21
PREAI
errWu, Chin-Chia; Bai, Danyu; Zhang, Xingong; Cheng, Shuenn-Ren; Lin, Jia-Cheng; Wu, Zong-Lin; Lin, Win-Chin
err分享
err收藏
Cloud theory-based simulated annealing for a single-machine past sequence setup scheduling with scenario-dependent processing times
err2020-10-15
err9
errOAAI
errWu, Chin-Chia; Lin, Win-Chin; Zhang, Xin-Gong; Bai, Dan-Yu; Tsai, Yung-Wei; Ren, Tao; Cheng, Shuenn-Ren
err分享
err收藏
err分享
err收藏
Dominance rule and opposition-based particle swarm optimization for two-stage assembly scheduling with time cumulated learning effect
err2018-09-11
err23
PREAI
errWang, Dujuan; Qiu, Huaxin; Wu, Chin-Chia; Lin, Win-Chin; Lai, Kunjung; Cheng, Shuenn-Ren
err分享
err收藏
A two-stage three-machine assembly scheduling problem with a position-based learning effect
err2017-11-15
err36
PREAI
errWu, Chin-Chia; Wang, Du-Juan; Cheng, Shuenn-Ren; Chung, I-Hong; Lin, Win-Chin
err分享
err收藏
Particle swarm optimization and opposite-based particle swarm optimization for two-agent multi-facility customer order scheduling with ready times
err2017-03-01
err39
PREAI
errLin, Win-Chin; Yin, Yunqiang; Cheng, Shuenn-Ren; Cheng, T. C. E.; Wu, Chia-Han; Wu, Chin-Chia
err分享
err收藏
err分享
err收藏
A two-machine flowshop scheduling problem with precedence constraint on two jobs
err2015-10-29
err8
PREAI
errCheng, Shuenn-Ren; Yin, Yunqiang; Wen, Chih-Hou; Lin, Win-Chin; Wu, Chin-Chia; Liu, Jun
err分享
err收藏
Some due date determination scheduling problems with two agents on a single machine
err2015-10-01
err27
PREAI
errWang, Du-Juan; Yin, Yunqiang; Xu, Jianyou; Wu, Wen-Hsiang; Cheng, Shuenn-Ren; Wu, Chin-Chia
err分享
err收藏
Using a branch-and-bound and a genetic algorithm for a single-machine total late work scheduling problem
err2015-01-24
err25
PREAI
errWu, Chin-Chia; Yin, Yunqiang; Wu, Wen-Hsiang; Chen, Hung-Ming; Cheng, Shuenn-Ren
err分享
err收藏
err分享
err收藏
The single-machine total tardiness problem with unequal release times and a linear deterioration
err2013-06-01
err10
PREAI
errWu, Chin-Chia; Cheng, Shuenn-Ren; Wu, Wen-Hsiang; Yin, Yunqiang; Wu, Wen-Hung
err分享
err收藏
Two-machine flowshop scheduling with a truncated learning function to minimize the makespan
err2013-01-01
err67
PREAI
errCheng, T. C. E.; Wu, Chin-Chia; Chen, Juei-Chao; Wu, Wen-Hsiang; Cheng, Shuenn-Ren
err分享
err收藏