科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
A
Ashtad Javanmardi
Syracuse University
7
H指数
20
论文数
320
被引数
0
相关解读
订阅
收录论文
6
发表时间
发表时间
IF
被引数
Improving Construction Meeting Effectiveness: Trade-Offs between Reactive and Proactive Site-Level Planning Discussions
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2024-09-01
3
PRE
AI
Javanmardi, Ashtad; Liu, Min; He, Chuanni; Hsiang, Simon M.; Abbasian-Hosseini, Alireza
分享
收藏
Enhancing Construction Project Workflow Reliability through Observe-Plan-Do-Check-React Cycle: A Bridge Project Case Study
BUILDINGS
IF
3.1
2023-09-19
7
OA
AI
Javanmardi, Ashtad; He, Chuanni; Hsiang, Simon M.; Abbasian-Hosseini, S. Alireza; Liu, Min
分享
收藏
How Does Experience with Delay Shape Managers' Making-Do Decision: Random Forest Approach
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2020-07-01
11
OA
AI
Zhang, YuXiang; Javanmardi, Ashtad; Liu, YanChun; Yang, ShuJuan; Yu, XiuXia; Hsiang, Simon M.; Jiang, ZhiHao; Liu, Min
分享
收藏
Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2020-04-01
7
PRE
AI
Javanmardi, Ashtad; Abbasian-Hosseini, S. Alireza; Liu, Min; Hsiang, Simon M.
分享
收藏
Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2018-03-01
35
PRE
AI
Javanmardi, Ashtad; Abbasian-Hosseini, S. Alireza; Liu, Min; Hsiang, Simon M.
分享
收藏
Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
AUTOMATION IN CONSTRUCTION
IF
11.5
2013-03-01
157
PRE
AI
Ghoddousi, Parviz; Eshtehardian, Ehsan; Jooybanpour, Shirin; Javanmardi, Ashtad
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
S
Shujuan Yang
H 指数: 35 · 论文数: 319
S
Simon M. Hsiang
H 指数: 26 · 论文数: 123
刘敏
(Min Liu)
H 指数: 23 · 论文数: 106
P
Parviz Ghoddousi
H 指数: 21 · 论文数: 65
E
Ehsan Eshtehardian
H 指数: 12 · 论文数: 28
查看更多