科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
fuzhou university
0
H指数
94
论文数
0
被引数
0
相关解读
订阅
收录论文
13
发表时间
发表时间
IF
被引数
Scheduling robotic cells with fixed processing times or time windows: Classification, solution approaches, polynomial algorithms and complexity
使用固定的处理时间或时间窗口调度机器人单元: 分类,求解方法,多项式算法和复杂性
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2024-12-01
2
OA
AI
Feng, Jianguang; Che, Ada; Chu, Chengbin; Levner, Eugene
分享
收藏
Cyclic multi-hoist scheduling with fuzzy processing times in flexible manufacturing lines
APPLIED SOFT COMPUTING
IF
6.6
2024-11-01
1
PRE
AI
Ptuskin, Alexander; Levner, Eugene; Kats, Vladimir
分享
收藏
A Heuristic for Inserting Randomly Arriving Jobs Into an Existing Hoist Schedule
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING
IF
6.4
2018-07-01
10
PRE
AI
Yan, Pengyu; Che, Ada; Levner, Eugene; Liu, Shi Qiang
分享
收藏
An efficient bicriteria algorithm for stable robotic flow shop scheduling
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2017-08-01
30
PRE
AI
Che, Ada; Kats, Vladimir; Levner, Eugene
分享
收藏
Integrated demand-responsive scheduling of maintenance and transportation operations in military supply chains
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2016-05-17
12
PRE
AI
Tsadikovich, Dmitry; Levner, Eugene; Tell, Hanan; Werner, Frank
分享
收藏
An entropy-based approach to identifying vulnerable components in a supply chain
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2014-07-14
15
PRE
AI
Levner, Eugene; Ptuskin, Alexander
分享
收藏
Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2008-06-01
33
PRE
AI
Kats, Vladimir; Lei, Lei; Levner, Eugene
分享
收藏
Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2007-02-01
28
PRE
AI
Alcaide, David; Chu, Chengbin; Kats, Vladimir; Levner, Eugene; Sierksma, Gerard
分享
收藏
A polynomial algorithm for 2-degree cyclic robot scheduling
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2003-02-01
56
PRE
AI
Che, A; Chu, CB; Levner, E
分享
收藏
Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2002-06-01
50
PRE
AI
Hiraishi, K; Levner, E; Vlach, M
分享
收藏
Cyclic scheduling in robotic flowshops
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2000-01-01
168
OA
AI
Crama, Y; Kats, V; van de Klundert, J; Levner, E
分享
收藏
Optimal control of assembling complexes under predetermined maintenance conditions
ANNALS OF OPERATIONS RESEARCH
IF
4.5
1999-01-01
0
PRE
AI
Kogan, K; Levner, E
分享
收藏
An improved algorithm for cyclic flowshop scheduling in a robotic cell
一种改进的机器人单元循环流水车间调度算法
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1997-03-01
106
PRE
AI
Levner, E; Kats, V; Levit, VE
分享
收藏
研究方向
暂无研究方向
合作学者
合作期刊
C
Chengbin Chu
H 指数: 56 · 论文数: 429
F
Frank Werner
H 指数: 47 · 论文数: 466
Y
Yves Crama
H 指数: 39 · 论文数: 259
A
Ada Che
H 指数: 33 · 论文数: 134
J
Joris van de Klundert
H 指数: 32 · 论文数: 143
查看更多