科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
Y
Yih‐Long Chang
university system of georgia
19
H指数
59
论文数
1.4K
被引数
0
相关解读
订阅
收录论文
9
发表时间
发表时间
IF
被引数
A new MRP/GT lot sizing heuristic: a simulation study
PRODUCTION PLANNING & CONTROL
IF
5.4
2010-11-14
2
PRE
AI
Ho, JC; Chang, YL
分享
收藏
The impact of delayed differentiation in make-to-order environments
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2009-10-29
21
PRE
AI
Su, Jack C. P.; Chang, Yih-Long; Ferguson, Mark; Ho, Johnny C.
分享
收藏
A scatter search approach to sequence-dependent setup times job shop scheduling
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2009-06-30
2
PRE
AI
Manikas, Andrew; Chang, Yih-Long
分享
收藏
Multi-criteria sequence-dependent job shop scheduling using genetic algorithms
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2009-02-01
34
PRE
AI
Manikas, Andrew; Chang, Yih-Long
分享
收藏
An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2007-09-01
21
PRE
AI
Ho, Johnny C.; Solis, Adriano O.; Chang, Yih-Long
分享
收藏
Evaluation of postponement structures to accommodate mass customization
JOURNAL OF OPERATIONS MANAGEMENT
IF
10.4
2004-12-23
124
PRE
AI
Su, JCP; Chang, YL; Ferguson, M
分享
收藏
An integrated MRP and JIT framework
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2001-11-01
43
PRE
AI
Ho, JC; Chang, YL
分享
收藏
MINIMIZING THE NUMBER OF TARDY JOBS FOR M-PARALLEL MACHINES
最大限度地减少M并行机的迟到作业数量
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1995-07-01
72
PRE
AI
HO, JC; CHANG, YL
分享
收藏
A NEW HEURISTIC FOR THE N-JOB, M-MACHINE FLOWSHOP PROBLEM
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1991-05-01
135
PRE
AI
HO, JC; CHANG, YL
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
M
Mark Ferguson
H 指数: 45 · 论文数: 210
J
Johnny C. Ho
H 指数: 35 · 论文数: 132
A
Andrew Manikas
H 指数: 19 · 论文数: 75
J
Jack C. P. Su
H 指数: 12 · 论文数: 27
A
Adriano O. Solis
H 指数: 11 · 论文数: 62
已加载全部