arrow
返回
E

E. Terence Foster

University of Dayton

5H指数
14论文数
127被引数
收录论文 3
发表时间
err分享
err收藏
Estimating Construction Labor Productivity Frontier: Pilot Study
err2017-10-01
err20
PREAI
errMani, Nirajan; Kisi, Krishna P.; Rojas, Eddy M.; Foster, E. Terence
err分享
err收藏
Optimal Productivity in Labor-Intensive Construction Operations: Pilot Study
err2017-03-01
err44
PREAI
errKisi, Krishna P.; Mani, Nirajan; Rojas, Eddy M.; Foster, E. Terence
err分享
err收藏