科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
G
Gül Polat
Dokuz Eylül University
25
H指数
105
论文数
1.9K
被引数
0
相关解读
订阅
收录论文
29
发表时间
发表时间
IF
被引数
Association of Molecular Classification with FIGO Stage and Survival Outcomes in Endometrial Cancer
子宫内膜癌中分子分型与FIGO分期及生存结局的关联
Medicina-Lithuania
IF
2.4
2026-04-29
1
PRE
AI
Keskinkilic, Merve; Polat, Gul; Bayramoglu, Zeynep; Agalar, Anil Aysal; Ozturk, Goksenil Bulbul; Ulukus, Emine Cagnur; Yavuzsen, Tugba; Oztop, Ilhan
分享
收藏
The group analytic hierarchy process (G-AHP) with preference aggregation by type-2 fuzzy envelope of extended hesitant fuzzy linguistic term set (EHFLTS)
基于扩展犹豫模糊语言术语集(EHFLTS)的第二型模糊包络偏好聚合的群体层次分析法(G-AHP)
Soft Computing
IF
2.5
2026-02-07
0
OA
AI
Michał Tomczak; Gül Polat
分享
收藏
Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects
基于金雕优化器的多目标优化模型用于施工项目调度
Construction Management and Economics
IF
3.3
2025-05-28
0
PRE
AI
Harun Turkoglu; David Arditi; Gul Polat
分享
收藏
RISK-BASED COMPLETION COST PREDICTION APPROACH IN CONSTRUCTION PROJECTS UTILIZING MACHINE LEARNING
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION
IF
3.8
2025-01-01
0
OA
AI
Turkyilmaz, Aynur Hurriyet; Polat, Gul
分享
收藏
Risk-Based Completion Cost Overrun Ratio Estimation in Construction Projects Using Machine Learning Classification Algorithms: A Case Study
使用机器学习分类算法在建设项目中基于风险的完工成本超支率估算: 案例研究
BUILDINGS
IF
3.1
2024-11-06
0
OA
AI
Turkyilmaz, Aynur Hurriyet; Polat, Gul
分享
收藏
A Performance-Based Subcontractor Selection Model
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2024-08-01
1
PRE
AI
Bingol, Befrin N.; Arditi, David; Polat, Gul
分享
收藏
Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2024-05-01
2
PRE
AI
Turkoglu, Harun; Arditi, David; Polat, Gul
分享
收藏
APPLICATION OF CONSTRUCTION 4.0 TECHNOLOGIES: EMPIRICAL FINDINGS FROM THE TURKISH CONSTRUCTION INDUSTRY
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION
IF
3.8
2024-03-29
0
OA
AI
Turkyilmaz, Aynur Hurriyet; Polat, Gul; Gurkan, Aysegul
分享
收藏
Mathematical Multiobjective Optimization Model for Trade-Offs in Small-Scale Construction Projects
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2023-07-01
3
PRE
AI
Turkoglu, Harun; Arditi, David; Polat, Gul
分享
收藏
An integrative literature review on the causes of delays in construction projects: evidence from developing countries
international entrepreneurship and management journal
IF
3.4
2022-11-08
7
PRE
AI
Selcuk, Onur; Turkoglu, Harun; Polat, Gul; Hajdu, Miklos
分享
收藏
Formwork System Selection in Building Construction Projects Using an Integrated Rough AHP-EDAS Approach: A Case Study
BUILDINGS
IF
3.1
2022-07-25
12
OA
AI
Terzioglu, Taylan; Polat, Gul
分享
收藏
Formwork System Selection Criteria for Building Construction Projects: A Structural Equation Modelling Approach
BUILDINGS
IF
3.1
2022-02-11
14
OA
AI
Terzioglu, Taylan; Polat, Gul; Turkoglu, Harun
分享
收藏
Analysis of Formwork System Selection Criteria for Building Construction Projects: A Comparative Study
BUILDINGS
IF
3.1
2021-12-06
15
OA
AI
Terzioglu, Taylan; Polat, Gul; Turkoglu, Harun
分享
收藏
A crashing-based time-cost trade-off model considering quality cost and contract clauses
international entrepreneurship and management journal
IF
3.4
2021-07-05
5
PRE
AI
Akin, Firat Dogu; Polat, Gul; Turkoglu, Harun; Damci, Atilla
分享
收藏
Crashing construction projects considering schedule flexibility: an illustrative example
international entrepreneurship and management journal
IF
3.4
2021-03-22
4
PRE
AI
Turkoglu, Harun; Polat, Gul; Akin, Firat Dogu
分享
收藏
Use of float consumption rate in resource leveling of construction projects
FRONTIERS OF ENGINEERING MANAGEMENT
IF
7.7
2020-06-04
6
PRE
AI
Damci, Atilla; Polat, Gul; Akin, Firat Dogu; Turkoglu, Harun
分享
收藏
Selection of HVAC-AHU system supplier with environmental considerations using Fuzzy EDAS method
international entrepreneurship and management journal
IF
3.4
2020-04-03
14
PRE
AI
Polat, Gul; Bayhan, Hasan Gokberk
分享
收藏
Civil engineers' personal values/demographics linkage in project team building
construction engineering and management
IF
3.9
2017-11-20
4
PRE
AI
Damci, Atilla; Arditi, David; Polat, Gul
分享
收藏
AN INTEGRATED FUZZY MCGDM APPROACH FOR SUPPLIER SELECTION PROBLEM
供应商选择问题的集成模糊MCGDM方法
management in engineering
IF
3.7
2017-07-13
38
OA
AI
Polat, Gul; Eray, Ekin; Bingol, Befrin Neval
分享
收藏
SUBCONTRACTOR SELECTION USING THE INTEGRATION OF THE AHP AND PROMETHEE METHODS
management in engineering
IF
3.7
2015-04-29
69
OA
AI
Polat, Gul
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
D
David Arditi
H 指数: 59 · 论文数: 277
D
Dong‐Eun Lee
H 指数: 45 · 论文数: 498
İ
İlhan Öztop
H 指数: 26 · 论文数: 194
M
Miklós Hajdu
H 指数: 13 · 论文数: 61
A
Atilla Damcı
H 指数: 11 · 论文数: 46
查看更多