arrow
返回
D

Daniel Alejandro Rossit

Universidad Nacional del Sur

17H指数
107论文数
1.4K被引数
收录论文 20
发表时间
A constraint programming-based lower bounding procedure for the job shop scheduling problem
err2025-05-01
err0
PREAI
errYuraszeck, Francisco; Mejia, Gonzalo; Rossit, Daniel Alejandro; Luer-Villagra, Armin
err分享
err收藏
Goal programming and multi-criteria methods in remanufacturing and reverse logistics: Systematic literature review and survey
err2023-11-01
err6
PREAI
errGuggeri, Elena Maria; Ham, Carolina; Silveyra, Pilar; Rossit, Daniel Alejandro; Pineyro, Pedro
err分享
err收藏
Cloud manufacturing architectures: State-of-art, research challenges and platforms description
err2023-08-01
err12
PREAI
errChiappa, Santiago; Videla, Emiliano; Viana-Cespedes, Victor; Pineyro, Pedro; Rossit, Daniel Alajandro
err分享
err收藏
OR in digital production and logistics management
err2023-01-31
err2
errOAAI
errCancela, Hector; Tohme, Fernando; Pineyro, Pedro; Rossit, Daniel Alejandro
err分享
err收藏
err分享
err收藏
Stochastic forestry harvest planning under soil compaction conditions
err2021-10-01
err7
errOAAI
errRossit, Daniel; Pais, Cristobal; Weintraub, Andres; Broz, Diego; Frutos, Mariano; Tohme, Fernando
err分享
err收藏
A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems
err2021-03-01
err16
errOAAI
errRossit, Daniel A.; Vasquez, Oscar C.; Tohme, Fernando; Frutos, Mariano; Safe, Martin D.
err分享
err收藏
Application of a methodology to design a municipal waste pre-collection network in real scenarios一种方法在实际场景中设计城市垃圾预收集网络的应用
err2020-01-06
err16
errOAAI
errCavallin, Antonella; Gabriel Rossit, Diego; Herran Symonds, Victoria; Alejandro Rossit, Daniel; Frutos, Mariano
err分享
err收藏
Proposal and Comparative Study of Evolutionary Algorithms for Optimum Design of a Gear System
err2020-01-01
err9
errOAAI
errMendez, Maximo; Rossit, Daniel A.; Gonzalez, Begona; Frutos, Mariano
err分享
err收藏
A Big Data approach to forestry harvesting productivity
err2019-06-01
err28
errOAAI
errAlejandro Rossit, Daniel; Olivera, Alejandro; Viana Cespedes, Victor; Broz, Diego
err分享
err收藏
Industry 4.0: Smart Scheduling行业4.0: 智能调度
err2018-08-03
err199
errOAAI
errAlejandro Rossit, Daniel; Tohme, Fernando; Frutos, Mariano
err分享
err收藏
The Non-Permutation Flow-Shop scheduling problem: A literature review
err2018-06-01
err97
errOAAI
errAlejandro Rossit, Daniel; Tohme, Fernando; Frutos, Mariano
err分享
err收藏