科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
G
Ghang Lee
Yonsei University
32
H指数
184
论文数
4.8K
被引数
0
相关解读
订阅
收录论文
43
发表时间
发表时间
IF
被引数
Conversational programming for structural model review and editing via conversational corrective grounding (CCG)
基于对话式修正性基础(CCG)的结构模型审查与编辑的对话式编程
Automation in Construction
IF
11.5
2026-04-30
0
PRE
AI
Justin S. Lee; Ghang Lee
分享
收藏
Automated BIM generation from inconsistent multi-view raster architectural drawings with missing dimensions
从缺失尺寸的不一致多视图栅格建筑图纸中自动生成建筑信息模型
Automation in Construction
IF
11.5
2026-04-19
0
PRE
AI
Hyunjun Lee; Suhyung Jang; Junghun Lee; H. David Jeong; Ghang Lee
分享
收藏
Automated conversion and semantic gap filling of material layer annotations from CAD drawings to semantically rich BIM objects
从CAD图纸到语义丰富的BIM对象的材料层标注的自动化转换和语义间隙填充
Advanced Engineering Informatics
IF
9.9
2025-12-10
0
OA
AI
Sungkyu Lee; Miyoung Uhm; H.David Jeong; Ghang Lee
分享
收藏
Automated analysis of construction safety accident videos using a large multimodal model and graph retrieval-augmented generation
基于大型多模态模型和图检索增强生成的建筑施工安全事故视频自动分析
Automation in Construction
IF
11.5
2025-06-26
0
PRE
AI
Miyoung Uhm; Jaehee Kim; Ghang Lee
分享
收藏
Semantic elaboration of low-LOD BIMs: Inferring functional requirements using graph neural networks
ADVANCED ENGINEERING INFORMATICS
IF
9.9
2025-03-01
0
PRE
AI
Jang, Suhyung; Lee, Ghang; Park, Minkyeong; Lee, Jaekun; Suh, Seungah; Koo, Bonsang
分享
收藏
Hybrid large language model approach for prompt and sensitive defect management: A comparative analysis of hybrid, non-hybrid, and GraphRAG approaches
ADVANCED ENGINEERING INFORMATICS
IF
9.9
2025-03-01
0
PRE
AI
Jeon, Kahyun; Lee, Ghang
分享
收藏
Zero-shot monitoring of construction workers' ' personal protective equipment based on image captioning
AUTOMATION IN CONSTRUCTION
IF
11.5
2024-08-01
3
PRE
AI
Gil, Daeyoung; Lee, Ghang
分享
收藏
Automated detailing of exterior walls using NADIA: Natural-language-based architectural detailing through interaction with AI
使用NADIA自动进行外墙细节设计: 通过与AI交互实现基于自然语言的建筑细节设计
ADVANCED ENGINEERING INFORMATICS
IF
9.9
2024-08-01
2
PRE
AI
Jang, Suhyung; Lee, Ghang; Oh, Jiseok; Lee, Junghun; Koo, Bonsang
分享
收藏
Chatbot-engaged construction daily work report using mobile messenger
使用移动信使的Chatbot-从事建筑日常工作报告
AUTOMATION IN CONSTRUCTION
IF
11.5
2023-10-01
0
PRE
AI
Cho, Jehyun; Lee, Ghang; Song, Taeseok; Jeong, H. David
分享
收藏
Automated hand-marked semantic text recognition from photographs
SCIENTIFIC REPORTS
IF
3.9
2023-08-30
0
OA
AI
Suh, Seungah; Lee, Ghang; Gil, Daeyoung; Kim, Yonghan
分享
收藏
Named entity recognition of building construction defect information from text with linguistic noise
AUTOMATION IN CONSTRUCTION
IF
11.5
2022-11-01
17
PRE
AI
Jeon, Kahyun; Lee, Ghang; Yang, Seongmin; Jeong, H. David
分享
收藏
Automated generation of a model view definition from an information delivery manual using idmXSD and buildingSMART data dictionary
ADVANCED ENGINEERING INFORMATICS
IF
9.9
2022-10-01
6
PRE
AI
Son, Seungwoo; Lee, Ghang; Jung, Jeaeun; Kim, Jungdae; Jeon, Kahyun
分享
收藏
A relational framework for smart information delivery manual (IDM) specifications
ADVANCED ENGINEERING INFORMATICS
IF
9.9
2021-08-01
4
PRE
AI
Jeon, Kahyun; Lee, Ghang; Kang, Seoungwoo; Roh, Hyunsung; Jung, Jeaeun; Lee, Kyungha; Baldwin, Mark
分享
收藏
Framework for technical specifications of 3D concrete printers
3D混凝土打印机技术规范框架
AUTOMATION IN CONSTRUCTION
IF
11.5
2021-07-01
18
PRE
AI
Chung, Jihoon; Lee, Ghang; Kim, Jung-Hoon
分享
收藏
BIM policy and management
CONSTRUCTION MANAGEMENT AND ECONOMICS
IF
3.3
2020-03-28
39
OA
AI
Lee, Ghang; Borrmann, Andre
分享
收藏
Enhancing Subcontractors' Participation in BIM-Based Design Coordination under a DBB Contract
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2019-11-01
31
PRE
AI
Jang, Sejun; Jeong, Yeonsuk; Lee, Ghang; Kang, Youngcheol
分享
收藏
Automated classification of building information modeling (BIM) case studies by BIM use based on natural language processing (NLP) and unsupervised learning
基于自然语言处理 (NLP) 和无监督学习的BIM使用对建筑信息模型 (BIM) 案例研究的自动分类
ADVANCED ENGINEERING INFORMATICS
IF
9.9
2019-08-01
53
PRE
AI
Jung, Namcheol; Lee, Ghang
分享
收藏
Prototype development and test of a server-independent smart exit sign system: An algorithm, a hardware configuration, and its communication reliability
AUTOMATION IN CONSTRUCTION
IF
11.5
2018-06-01
10
PRE
AI
Kim, Hyunoh; Lee, Ghang; Cho, Jehyun
分享
收藏
IMPACT OF ORGANIZATIONAL FACTORS ON DELAYS IN BIM-BASED COORDINATION FROM A DECISION-MAKING VIEW: A CASE STUDY
management in engineering
IF
3.7
2018-03-01
12
OA
AI
Jang, Sejun; Lee, Ghang
分享
收藏
An analysis of BIM jobs and competencies based on the use of terms in the industry
AUTOMATION IN CONSTRUCTION
IF
11.5
2017-09-01
70
PRE
AI
Uhm, Miyoung; Lee, Ghang; Jeon, Boyoung
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
J
Jack C.P. Cheng
H 指数: 71 · 论文数: 421
R
Rafael Sacks
H 指数: 59 · 论文数: 272
C
Charles M. Eastman
H 指数: 53 · 论文数: 265
H
Hae‐Kwon Jeong
H 指数: 43 · 论文数: 148
A
André Borrmann
H 指数: 42 · 论文数: 449
查看更多