Multi-stage structural identification of a tall timber building during construction: The role of connections and non-structural elements高大木结构建筑在施工过程中的多阶段结构识别:连接件和非结构构件的作用Journal of Building EngineeringIF7.42025-10-310OAAI
Initial monitoring of a six-story lightweight timber frame building under different environmental conditionsJOURNAL OF CIVIL STRUCTURAL HEALTH MONITORINGIF4.32024-10-080OA
Dynamic evaluation of a nine-storey timber-concrete hybrid building during constructionENGINEERING STRUCTURESIF6.42023-08-016OAAI
Long-term analysis of the environmental effects on the global dynamic properties of a hybrid timber-concrete buildingENGINEERING STRUCTURESIF6.42022-10-0117OAAI
Determination of coefficients of friction for laminated veneer lumber on steel under high pressure loadsFRICTIONIF8.22020-11-1621OAAI
Torsional warping eigenmodes of FGM beams with longitudinally varying material properties具有纵向变化材料特性的FGM梁的扭转翘曲本征模ENGINEERING STRUCTURESIF6.42018-11-0111PREAI
Integrative experimental characterization and engineering modeling of single-dowel connections in LVLCONSTRUCTION AND BUILDING MATERIALSIF82016-03-0116PREAI
Experimental characterization of the global and local behavior of multi-dowel LVL-connections under complex loadingMATERIALS AND STRUCTURESIF3.92015-07-037PREAI