科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
S
Sucha, Premysl
czech technical university prague
0
H指数
2
论文数
0
被引数
0
相关解读
订阅
收录论文
30
发表时间
发表时间
IF
被引数
Urgent samples in clinical laboratories: stochastic batching to minimize patient turnaround time
临床实验室中的紧急样本:随机分批以最小化患者周转时间
Health Care Management Science
IF
2
2026-03-25
0
PRE
AI
Novak, Antonin; Gnatowski, Andrzej; Sucha, Premysl
分享
收藏
Prediction driven control of a gas turbine–battery hybrid power plant providing an ancillary service
提供辅助服务的燃气轮机-电池混合动力装置的预测驱动控制
Applied Energy
IF
11
2026-01-07
0
OA
AI
Petr Stejskal; Přemysl Šůcha; Ondřej Mamula
分享
收藏
Minimizing the weighted number of tardy jobs: Data-driven heuristic for single-machine scheduling
最小化加权 tardy 工件数量:面向单机调度的数据驱动启发式算法
Computers & Operations Research
IF
4.3
2025-09-26
0
OA
AI
Nikolai Antonov; Přemysl Šůcha; Mikoláš Janota; Jan Hůla
分享
收藏
A bilevel approach to integrated surgeon scheduling and surgery planning solved via branch-and-price
一种通过分支定价法求解的集成外科医生排班与手术规划的分层方法
Omega
IF
0
2025-09-12
0
OA
AI
Broos Maenhout; Přemysl Šůcha; Viktorie Valdmanova; Ondřej Tkadlec; Jana Thao Rozlivkova
分享
收藏
Purchase and production optimization in a meat processing plant
肉类加工厂中的采购与生产优化
International Transactions in Operational Research
IF
2.9
2025-08-27
0
OA
AI
Marek Vlk; Přemysl Šůcha; Jarosław Rudy; Radosław Idzikowski
分享
收藏
A machine learning approach to rank pricing problems in branch-and-price
一种在分支和价格中排序定价问题的机器学习方法
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2025-01-01
0
PRE
AI
Koutecka, Pavlina; Sucha, Premysl; Hula, Jan; Maenhout, Broos
分享
收藏
Stand-alone Hybrid Power Plant for Ancillary Services Provision
独立混合动力装置提供辅助服务
2024 24TH INTERNATIONAL SCIENTIFIC CONFERENCE ON ELECTRIC POWER ENGINEERING, EPE 2024
IF
0
2024-05-15
0
PRE
AI
Mamula, Ondrej; Stejskal, Petr; Hrycej, David; Sucha, Premysl; Cejnek, Matous; Kadera, Petr
分享
收藏
Deep learning-driven scheduling algorithm for a single machine problem minimizing the total tardiness
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2023-08-01
5
OA
AI
Bouska, Michal; Suchaa, Premysl; Novak, Antonin; Hanzalek, Zdenek
分享
收藏
Distributionally robust scheduling algorithms for total flow time minimization on parallel machines using norm regularizations
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2022-10-01
9
PRE
AI
Novak, Antonin; Gnatowski, Andrzej; Sucha, Premysl
分享
收藏
Minimizing the weighted number of tardy jobs on a single machine: Strongly correlated instances
最小化单台机器上迟到作业的加权数量: 强相关实例
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2022-04-01
3
PRE
AI
Hejl, Lukas; Sucha, Premysl; Novak, Antonin; Hanzalek, Zdenek
分享
收藏
Scheduling jobs with normally distributed processing times on parallel machines
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2022-03-01
9
PRE
AI
Novak, Antonin; Sucha, Premysl; Novotny, Matej; Stec, Richard; Hanzalek, Zdenek
分享
收藏
The bilevel optimisation of a multi-agent project scheduling and staffing problem
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2022-01-01
9
OA
AI
Milicka, P.; Sucha, P.; Vanhoucke, M.; Maenhout, B.
分享
收藏
Nash equilibrium solutions in multi-agent project scheduling with milestones
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2021-10-01
6
OA
AI
Sucha, Premysl; Agnetis, Alessandro; Sidlovsky, Marko; Briand, Cyril
分享
收藏
On parallel dedicated machines scheduling under energy consumption limit
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2021-09-01
13
PRE
AI
Modos, Istvan; Sucha, Premysl; Hanzalek, Zdenek
分享
收藏
A polynomial-time scheduling approach to minimise idle energy consumption: An application to an industrial furnace
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2021-04-01
4
OA
AI
Benedikt, Ondrej; Alikoc, Baran; Sucha, Premysl; Celikovsky, Sergej; Hanzalek, Zdenek
分享
收藏
Scheduling with uncertain processing times in mixed-criticality systems
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2019-12-01
9
PRE
AI
Novak, Antonin; Sucha, Premysl; Hanzalek, Zdenek
分享
收藏
Price of anarchy and price of stability in multi-agent project scheduling
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2019-04-15
6
PRE
AI
Agnetis, Alessandro; Briand, Cyril; Ngueveu, Sandra Ulrich; Sucha, Premysl
分享
收藏
Optimizing energy consumption of robotic cells by a Branch & Bound algorithm
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2019-02-01
29
PRE
AI
Bukata, Libor; Sucha, Premysl; Hanzalek, Zdenek
分享
收藏
Accelerating the Branch-and-Price Algorithm Using Machine Learning
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2018-12-01
35
PRE
AI
Vaclavik, Roman; Novak, Antonin; Sucha, Premysl; Hanzalek, Zdenek
分享
收藏
Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources (vol 248, pg 209, 2017)
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2017-11-21
0
OA
AI
Hanzalek, Zdenek; Sucha, Premysl
分享
收藏
研究方向
暂无研究方向
合作学者
合作期刊
M
Mario Vanhoucke
H 指数: 54 · 论文数: 461
B
Benny Åkesson
H 指数: 35 · 论文数: 206
A
Alessandro Agnetis
H 指数: 28 · 论文数: 182
Z
Zdeněk Hanzálek
H 指数: 27 · 论文数: 211
S
Sergej Čelikovský
H 指数: 26 · 论文数: 195
查看更多