arrow
A

Ali A. Rajhi

king khalid university
H指数:22
被引数:1,438

个人简介

暂无内容

教育背景

暂无内容

工作经历

暂无内容

荣誉奖项

暂无内容

Retraction notice to "Combined heat and power system based on a proton conducting SOFC and a supercritical CO2 Brayton cycle triggered by biomass gasification" [International Journal of Hydrogen Energy 47 (2022) 5439-5452]

撤稿通知:"基于质子导电SOFC和超临界CO2布雷顿循环的生物质气化触发冷热电联产系统" [International Journal of Hydrogen Energy 47 (2022) 5439-5452]

2026-09-180
PRE
Retraction notice to “Thermo-economic investigation on the hydrogen production through the stored solar energy in a salinity gradient solar pond: A comparative study by employing APC and ORC with zeotropic mixture” [Int J Hydrogen Energy 47(2022) 7600-7623]

撤稿通知:“利用盐度梯度太阳能池中储存的太阳能生产氢的热经济性研究:采用共沸混合物进行APC和ORC的对比研究”[Int J Hydrogen Energy 47(2022) 7600-7623]

2026-07-110
PRE
Retraction notice to “Multi-objective optimization of a clean combined system based gasifier-solid oxide fuel cell” [Int J Hydrogen Energy 47(2022) 18648-18662]

撤稿通知:“基于气化器-固体氧化物燃料电池的清洁组合系统多目标优化”[Int J Hydrogen Energy 47(2022) 18648-18662]

2026-07-090
PRE
Retraction notice to ‘The effect of using phase change materials in solar panel cooling to provide green and sustainable energy of a building’ [Journal of Building Engineering 57 (2022) 104933]

撤稿通知:关于“使用相变材料在太阳能板冷却中为建筑提供绿色和可持续能源的效果” [《建筑工程杂志》第57卷,2022年第104933期]

2026-02-270
PRE
Retraction notice to ‘Transient analysis of buildings with Trombe wall in a southern envelope and strengthening efficacy by adding phase change material’ [J. Build. Eng. 55 (2022) 104670]

撤稿通知:‘带有南向围护结构特朗贝墙的建筑瞬态分析及通过添加相变材料进行加固的有效性’ [J. Build. Eng. 55 (2022) 104670]

2026-02-250
PRE
Retraction notice to ‘The effect of using phase change materials in the walls of a building on the amount of carbon dioxide production and reducing fuel consumption’ [Journal of Building Engineering 59 (2022) 105058]

撤稿通知:‘The effect of using phase change materials in the walls of a building on the amount of carbon dioxide production and reducing fuel consumption’ [Journal of Building Engineering 59 (2022) 105058]

2026-02-250
PRE