arrow
返回
W

Wenkai Li

dalian university

19H指数
61论文数
1.5K被引数
收录论文 21
发表时间
U-shaped association between ultra-processed food intake and overactive bladder in US adults: a national cross-sectional study超加工食品摄入与膀胱过度活动症之间的U型关联:一项美国全国性横断面研究
err2025-08-06
err0
errOAAI
errZufa Zhang†; Li Chen†; Long Lv†; Wenkai Li; Bin Hou; Sheng Guan; Zuyi Chen; Danni He; Hongxuan Song; Weibing Sun; Feng Tian; Fengze Jiang; Sixiong Jiang
err分享
err收藏
Generation and characterization of intense terahertz pulses from DSTMS crystalDSTMS晶体中强太赫兹脉冲的产生和表征
err2023-07-05
err16
errOAAI
errMeng, Xianze; Wang, Kang; Yu, Xieqiu; Ding, Yingying; Zeng, Yushan; Lin, Ting; Feng, Renyu; Li, Wenkai; Liu, Yi; Tian, Ye; Song, Liwei
err分享
err收藏
err分享
err收藏
vcfpop: Performing population genetics analyses for autopolyploids and aneuploids based on next-generation sequencing data setsvcfpop: 基于下一代测序数据集对同源多倍体和非整倍体进行群体遗传学分析
err2022-12-18
err0
PREAI
errHuang, Kang; Li, Wenkai; Yang, Bing; Wang, Dan; He, Shujun; Shen, Yujia; Ao, Jincuo; Li, Yuhang; Cui, Yunxia; Kong, Yuchen; Li, Wei; Li, Nianlong; Dunn, Derek W.; Li, Baoguo
err分享
err收藏
Scheduling Multiple Yard Cranes with Crane Interference and Safety Distance Requirement
err2015-11-01
err59
errOAAI
errWu, Yong; Li, Wenkai; Petering, Matthew E. H.; Goh, Mark; de Souza, Robert
err分享
err收藏
err分享
err收藏
err分享
err收藏
A continuous time model for multiple yard crane scheduling with last minute job arrivals
err2012-04-01
err58
errOAAI
errLi, Wenkai; Goh, Mark; Wu, Yong; Petering, M. E. H.; de Souza, R.; Wu, Y. C.
err分享
err收藏
Discrete time model and algorithms for container yard crane scheduling
err2009-10-01
err125
errOAAI
errLi, Wenkai; Wu, Yong; Petering, M. E. H.; Goh, Mark; de Souza, Robert
err分享
err收藏
Decision support for integrated refinery supply chains Part 1. Dynamic simulation
err2008-11-01
err59
PREAI
errPitty, Suresh S.; Li, Wenkai; Adhitya, Arief; Srinivasan, Rajagopalan; Karimi, I. A.
err分享
err收藏
Improving the robustness and efficiency of crude scheduling algorithms
err2007-08-31
err88
PREAI
errLi, Jie; Li, Wenkai; Karimi, I. A.; Srinivasan, Rajagopalan
err分享
err收藏
Long-term electricity contract optimization with demand uncertainties
errENERGY
IF9.4
err2006-10-01
err10
errOAAI
errChan, Pang; Hui, Chi-Wai; Li, Wenkai; Sakamoto, Haruo; Hirata, Kentaro; Li, Pu
err分享
err收藏
Refinery planning under uncertainty
err2004-09-10
err85
PREAI
errLi, WK; Hui, CW; Li, P; Li, AX
err分享
err收藏