科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
N
Nikolay Tchernev
Mohammed VI Polytechnic University
18
H指数
152
论文数
1.3K
被引数
0
相关解读
订阅
收录论文
30
发表时间
发表时间
IF
被引数
A GRASPxVNS approach for the flexible job shop scheduling with generic minimal time lags
一种GRASPxVNS方法用于具有通用最小时间间隔的柔性作业车间调度
Computers & Industrial Engineering
IF
6.5
2026-03-04
0
PRE
AI
Soufiane Aallaoui; Ahlam Azzamouri; Libo Ren; Nikolay Tchernev
分享
收藏
A novel rolling horizon product-centric MILP based approach for a real-world integrated production and distribution scheduling problem
一种基于滚动时域、以产品为中心的MILP的新型方法,用于解决实际集成生产与分销调度问题
Omega
IF
0
2025-12-12
0
PRE
AI
Mouad Sidki; Tchernev Nikolay; Pierre Féniès; Libo Ren; Selwa El Firdoussi
分享
收藏
A monolithic batch-centric MILP approach for a real-world integrated production and pipeline distribution scheduling problem
一种针对实际集成化生产与管道配送调度问题的整体式、面向批次的MILP方法
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2025-05-01
0
PRE
AI
Sidki, Mouad; Tchernev, Nikolay; Fenies, Pierre; Ren, Libo; Elfirdoussi, Selwa
分享
收藏
Heuristic based decision approach for an integrated slurry pipeline network scheduling in the phosphate industry☆
基于启发式方法的磷酸盐工业集成矿浆管道网络调度研究☆
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2025-04-01
1
PRE
AI
Sidki, Mouad; Tchernev, Nikolay; Fenies, Pierre; Ren, Libo; Elfirdoussi, Selwa
分享
收藏
Multiproduct pipeline scheduling: A comprehensive bibliometric analysis and a systematic literature review
多产品管道调度: 全面的文献计量分析和系统的文献综述
COMPUTERS & CHEMICAL ENGINEERING
IF
3.9
2025-01-01
1
PRE
AI
Sidki, Mouad; Tchernev, Nikolay; Fenies, Pierre; Ren, Libo; Elfirdoussi, Selwa
分享
收藏
Exact and metaheuristic approaches to solve the integrated production scheduling, berth allocation and storage yard allocation problem
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2023-05-01
12
OA
AI
Cheimanoff, Nicolas; Fenies, Pierre; Kitri, Mohamed Nour; Tchernev, Nikolay
分享
收藏
An efficient GRASP-like algorithm for the multi-product straight pipeline scheduling problem
求解多产品直管道调度问题的一种高效类grasm算法
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2023-02-01
10
OA
AI
Bamoumen, Meryem; Elfirdoussi, Selwa; Ren, Libo; Tchernev, Nikolay
分享
收藏
Exact and heuristic methods for the berth allocation problem with multiple continuous quays in tidal bulk terminals
潮汐散货码头多个连续码头泊位分配问题的精确和启发式方法
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2022-09-01
13
PRE
AI
Cheimanoff, Nicolas; Fontane, Frederic; Kitri, Mohamed Nour; Tchernev, Nikolay
分享
收藏
Exact and heuristic methods for the integrated berth allocation and specific time-invariant quay crane assignment problems
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2022-05-01
21
OA
AI
Cheimanoff, Nicolas; Fontane, Frederic; Kitri, Mohamed Nour; Tchernev, Nikolay
分享
收藏
A reduced VNS based approach for the dynamic continuous berth allocation problem in bulk terminals with tidal constraints
具有潮汐约束的散货码头动态连续泊位分配问题的基于VNS的简化方法
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2021-04-01
25
OA
AI
Cheimanoff, Nicolas; Fontane, Frederic; Kitri, Mohamed Nour; Tchernev, Nikolay
分享
收藏
A constraint-programming based decomposition method for the Generalised Workforce Scheduling and Routing Problem (GWSRP)
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2020-12-26
7
OA
AI
Bourreau, E.; Garaix, T.; Gondran, M.; Lacomme, P.; Tchernev, N.
分享
收藏
Bi-objective optimisation approaches to Job-shop problem with power requirements
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2020-12-01
8
OA
AI
Gondran, Matthieu; Kemmoe, Sylverin; Lamy, Damien; Tchernev, Nikolay
分享
收藏
A population-based metaheuristic for the capacitated lot-sizing problem with unrelated parallel machines
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2020-01-07
11
PRE
AI
Vincent, Benjamin; Duhamel, Christophe; Ren, Libo; Tchernev, Nikolay
分享
收藏
Job-shop like manufacturing system with variable power threshold and operations with power requirements
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2017-04-28
25
PRE
AI
Kemmoe, Sylverin; Lamy, Damien; Tchernev, Nikolay
分享
收藏
A GRASP x ELS approach for the job-shop with a web service paradigm packaging
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2014-02-01
15
PRE
AI
Chassaing, Maxime; Fontanel, Jonathan; Lacomme, Philippe; Ren, Libo; Tchernev, Nikolay; Villechenon, Pierre
分享
收藏
Model for flexibility evaluation in manufacturing network strategic planning
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2013-10-17
19
PRE
AI
Kemmoe, Sylverin; Pernot, Pierre-Alban; Tchernev, Nikolay
分享
收藏
Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2013-05-01
132
PRE
AI
Lacomme, Philippe; Larabi, Mohand; Tchernev, Nikolay
分享
收藏
A decisional modelling for supply chain management in franchised networks: application in franchise bakery networks
PRODUCTION PLANNING & CONTROL
IF
5.4
2010-10-01
7
PRE
AI
Fenies, Pierre; Lagrange, Samuel; Tchernev, Nikolay
分享
收藏
Special Issue on Supply Chain Design
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2009-12-01
2
PRE
AI
Rappold, James A.; Tchernev, Nikolay
分享
收藏
An MILP for scheduling problems in an FMS with one vehicle
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2009-12-01
73
PRE
AI
Caumond, A.; Lacomme, P.; Moukrim, A.; Tchernev, N.
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
B
Benjamin G. Vincent
H 指数: 51 · 论文数: 454
P
Philippe Lacomme
H 指数: 27 · 论文数: 365
A
A Tanguy
H 指数: 25 · 论文数: 85
A
Abdelhakim Artiba
H 指数: 24 · 论文数: 208
A
Aziz Moukrim
H 指数: 23 · 论文数: 180
查看更多