科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
V
Vincent t'Kindt
University of Tours
20
H指数
246
论文数
2.2K
被引数
0
相关解读
订阅
收录论文
23
发表时间
发表时间
IF
被引数
Solution of a bilevel optimistic scheduling problem on parallel machines
并行机器上双层乐观调度问题的求解
Annals of Operations Research
IF
4.5
2026-05-29
0
OA
AI
Quentin Schau; Olivier Ploton; Vincent T’kindt; Han Hoogeveen; Federico Della Croce; Jippe Hoogeveen
分享
收藏
Scheduling a shared resource among parallel dedicated machines: a red-blue knapsack modeling approach
在并行专用机器上调度共享资源:一种红蓝背包建模方法
Annals of Operations Research
IF
4.5
2025-11-17
0
OA
AI
Federico Della Croce; Andrea Grosso; Vincent T’kindt; T. Ciron
分享
收藏
Moderate exponential-time quantum dynamic programming across the subsets for scheduling problems
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2025-02-01
0
OA
AI
Grange, Camille; Poss, Michael; Bourreau, Eric; T'kindt, Vincent; Ploton, Olivier
分享
收藏
Comparison Queries Generation Using Mathematical Programming for Exploratory Data Analysis
IEEE TRANSACTIONS ON KNOWLEDGE AND DATA ENGINEERING
IF
10.4
2024-12-01
0
PRE
AI
Chanson, Alexandre; Labroche, Nicolas; Marcel, Patrick; T'Kindt, Vincent
分享
收藏
Moderate exponential-time algorithms for scheduling problems
用于调度问题的中等指数时间算法
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2024-09-30
0
PRE
AI
T'kindt, Vincent; Croce, Federico Della; Liedloff, Mathieu
分享
收藏
Single machine adversarial bilevel scheduling problems
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2024-05-01
2
OA
AI
T'kindt, Vincent; Della Croce, Federico; Agnetis, Alessandro
分享
收藏
Structured learning based heuristics to solve the single machine scheduling problem with release times and sum of completion times
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2023-03-01
4
OA
AI
Parmentier, Axel; T'Kindt, Vincent
分享
收藏
Single machine rescheduling for new orders with maximum lateness minimization
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2022-08-01
3
PRE
AI
Rener, Elena; Salassa, Fabio; T'kindt, Vincent
分享
收藏
Exact solution of the two-machine flow shop problem with three operations
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2022-02-01
2
PRE
AI
Della Croce, Federico; Salassa, Fabio; T'kindt, Vincent
分享
收藏
Parallel machine scheduling with minimum number of tardy jobs: Approximation and exponential algorithms
APPLIED MATHEMATICS AND COMPUTATION
IF
3.4
2021-05-01
5
OA
AI
Della Croce, Federico; T'kindt, Vincent; Ploton, Olivier
分享
收藏
Branch & Memorize exact algorithms for sequencing problems: Efficient embedding of memorization into search trees
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2021-04-01
4
OA
AI
Shang, Lei; T'Kindt, Vincent; Della Croce, Federico
分享
收藏
Graph edit distance: Accuracy of local branching from an application point of view
PATTERN RECOGNITION LETTERS
IF
3.3
2020-06-01
3
OA
AI
Darwiche, Mostafa; Conte, Donatello; Raveaux, Romain; T'Kindt, Vincent
分享
收藏
A local branching heuristic for solving a Graph Edit Distance Problem
解决图编辑距离问题的局部分支启发式方法
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2019-06-01
7
OA
AI
Darwiche, Mostafa; Conte, Donatello; Raveaux, Romain; T'Kindt, Vincent
分享
收藏
A constraint generation approach for two-machine shop problems with jobs selection
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2017-06-01
9
PRE
AI
Della Croce, Federico; Koulamas, Christos; T'kindt, Vincent
分享
收藏
A two-stage robustness approach to evacuation planning with buses
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
IF
6.3
2015-08-01
56
OA
AI
Goerigk, Marc; Deghdak, Kaouthar; T'Kindt, Vincent
分享
收藏
A hybrid heuristic approach for single machine scheduling with release times
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2014-05-01
16
PRE
AI
Della Croce, Federico; Salassa, Fabio; Tkindt, Vincent
分享
收藏
Project Management and Scheduling: From Theory to Computation Preface
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2014-01-10
0
OA
AI
T'kindt, Vincent; Neron, Emmanuel
分享
收藏
Preprocessing for a map sectorization problem by means of mathematical programming
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2013-09-13
6
PRE
AI
Tang, Xin; Soukhal, Ameur; T'kindt, Vincent
分享
收藏
Coupling Genetic Local Search and Recovering Beam Search algorithms for minimizing the total completion time in the single machine scheduling problem subject to release dates
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2012-06-01
12
PRE
AI
Rakrouki, Mohamed Ali; Ladhari, Talel; T'kindt, Vincent
分享
收藏
Special Issue on Scheduling in Manufacturing Systems
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2012-06-01
0
PRE
AI
Lazarev, Alexander; T'kindt, Vincent; Werner, Frank
分享
收藏
研究方向
暂无研究方向
合作学者
合作期刊
F
Frank Werner
H 指数: 47 · 论文数: 466
F
Federico Della Croce
H 指数: 30 · 论文数: 212
A
Alessandro Agnetis
H 指数: 28 · 论文数: 182
A
Andrea Grosso
H 指数: 25 · 论文数: 88
M
Marc Goerigk
H 指数: 23 · 论文数: 184
查看更多