科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
J
Jirachai Buddhakulsomsiri
thammasat university
14
H指数
84
论文数
854
被引数
0
相关解读
订阅
收录论文
19
发表时间
发表时间
IF
被引数
Load-dependent vehicle routing problem with route time constraint: a heuristic approach
带路径时间约束的负载依赖型车辆路径问题:一种启发式方法
Cogent Engineering
IF
2.5
2025-12-31
0
PRE
AI
Trang, Nguyen Thuy; Parthanadee, Parthana; Buddhakulsomsiri, Jirachai; Duc Tai, Pham
分享
收藏
A multi-thread simulated annealing for multi-objective vehicle routing problem with time windows and demand priority
多线程模拟退火算法在带时间窗和需求优先级的车辆路径多目标优化问题中的应用
Computers & Industrial Engineering
IF
6.5
2025-06-04
0
PRE
AI
Thanapat Leelertkij; Jirachai Buddhakulsomsiri; Van-Nam Huynh
分享
收藏
A mathematical model for the integrated problem of production network design and inventory positioning
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2024-05-01
0
PRE
AI
Duc, Nguyen Trong Tri; Buddhakulsomsiri, Jirachai; Tai, Pham Duc
分享
收藏
Revisiting measurement of compound bullwhip with asymmetric reference price
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2022-10-01
1
PRE
AI
Tai, Pham Duc; Buddhakulsomsiri, Jirachai; Duc, Truong Ton Hien
分享
收藏
Impacts of Harvesting Age and Pricing Schemes on Economic Sustainability of Cassava Farmers in Thailand under Market Uncertainty
SUSTAINABILITY
IF
3.3
2022-06-25
4
OA
AI
Pannakkong, Warut; Parthanadee, Parthana; Buddhakulsomsiri, Jirachai
分享
收藏
Inventory Positioning in Supply Chain Network: A Service-Oriented Approach
IEEE ACCESS
IF
3.6
2022-01-01
3
OA
AI
Nguyen Trong Tri Duc; Pham Duc Tai; Buddhakulsomsiri, Jirachai
分享
收藏
A Markovian approach to modeling a periodic order-up-to-level policy under stochastic discrete demand and lead time with lost sales
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
IF
2.9
2021-08-10
3
PRE
AI
Duc, Nguyen Trong Tri; Tai, Pham Duc; Buddhakulsomsiri, Jirachai
分享
收藏
Value of information sharing in supply chain under promotional competition
促销竞争下供应链信息共享的价值
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
IF
2.9
2020-08-07
18
PRE
AI
Pham Duc Tai; Truong Ton Hien Duc; Buddhakulsomsiri, Jirachai
分享
收藏
Measure of bullwhip effect in supply chain with price-sensitive and correlated demand
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2019-01-01
23
PRE
AI
Pham Duc Tai; Truong Ton Hien Duc; Buddhakulsomsiri, Jirachai
分享
收藏
Prediction models of starch content in fresh cassava roots for a tapioca starch manufacturer in Thailand
COMPUTERS AND ELECTRONICS IN AGRICULTURE
IF
8.9
2018-11-01
17
PRE
AI
Buddhakulsomsiri, Jirachai; Parthanadee, Parthana; Pannakkong, Warut
分享
收藏
Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (vol 175, pg 279, 2006)
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2015-01-01
1
PRE
AI
Buddhakulsomsiri, Jirachai; Kim, David S.
分享
收藏
A study of replacement rules for a parallel fleet replacement problem based on user preference utilization pattern and alternative fuel considerations
基于用户偏好利用模式和替代燃料考虑的平行车队替换问题的替换规则研究
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2012-08-01
24
PRE
AI
Parthanadee, Parthana; Buddhakulsomsiri, Jirachai; Charnsethikul, Peerayuth
分享
收藏
Production efficiency improvement in batch production system using value stream mapping and simulation: a case study of the roasted and ground coffee industry
PRODUCTION PLANNING & CONTROL
IF
5.4
2012-07-16
41
PRE
AI
Parthanadee, Parthana; Buddhakulsomsiri, Jirachai
分享
收藏
Simulation modeling and analysis for production scheduling using real-time dispatching rules: A case study in canned fruit industry
COMPUTERS AND ELECTRONICS IN AGRICULTURE
IF
8.9
2010-01-01
39
PRE
AI
Parthanadee, P.; Buddhakulsomsiri, J.
分享
收藏
Sequential pattern mining algorithm for automotive warranty data
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2009-08-01
34
PRE
AI
Buddhakulsomsiri, Jirachai; Zakarian, Armen
分享
收藏
Task time estimation in a multi-product manually operated workstation
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2008-07-01
4
PRE
AI
Kim, David S.; Porter, J. David; Buddhakulsomsiri, Jirachai
分享
收藏
Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2007-04-01
79
PRE
AI
Buddhakulsomsiri, Jirachai; Kim, David S.
分享
收藏
Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
具有资源休假和活动拆分的多模式资源受限项目调度问题的性质
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2006-11-01
71
PRE
AI
Buddhakulsomsiri, Jirachai; Kim, David S.
分享
收藏
Association rule-generation algorithm for mining automotive warranty data
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2006-07-15
51
PRE
AI
Buddhakulsomsiri, J.; Siradeghyan, Y.; Zakarian, A.; Li, X.
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
A
Armen Zakarian
H 指数: 40 · 论文数: 210
V
Van‐Nam Huynh
H 指数: 34 · 论文数: 338
D
David Kim
H 指数: 18 · 论文数: 101
J
J. David Porter
H 指数: 14 · 论文数: 71
P
Parthana Parthanadee
H 指数: 10 · 论文数: 36
查看更多