科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
E
Emre Çevikcan
industrial engineering
21
H指数
87
论文数
2.4K
被引数
0
相关解读
订阅
收录论文
20
发表时间
发表时间
IF
被引数
A unified robust stochastic programming approach for integrated production and distribution scheduling problem for seru production system under uncertainty
一种统一的鲁棒随机规划方法,用于在不确定性条件下解决seru生产系统的集成生产与分销调度问题
European Journal of Operational Research
IF
6
2026-03-24
0
PRE
AI
Beren Gürsoy Yılmaz; Ömer Faruk Yılmaz; Elif Akçalı; Emre Çevikcan
分享
收藏
Seru scheduling problem with lot streaming and worker transfers: A multi-objective approach
具有批量流和工人转移的Seru调度问题: 一种多目标方法
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2025-05-01
0
PRE
AI
Yilmaz, Beren Gursoy; Yilmaz, Omer Faruk; Akcali, Elif; Cevikcan, Emre
分享
收藏
Aggregated planning to solve multi-product multi-period disassembly line balancing problem by considering multi-manned stations: A generic optimization model and solution algorithms
考虑多人站的聚合规划求解多产品多周期拆解线平衡问题: 通用优化模型及求解算法
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2024-10-01
2
PRE
AI
Yeni, Fatma Betul; Cevikcan, Emre; Yazici, Busra; Yilmaz, Omer Faruk
分享
收藏
Evaluation of disassembly line layouts using an integrated fermatean fuzzy decision-making methodology: An application for refrigerator disassembly line
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2024-04-01
5
PRE
AI
Kose, Yildiz; Ayyildiz, Ertugrul; Cevikcan, Emre
分享
收藏
Lot streaming in workforce scheduling problem for seru production system under Shojinka philosophy
Shojinka哲学下seru生产系统劳动力调度问题中的批次流
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2023-11-01
13
PRE
AI
Yilmaz, Beren Gursoy; Yilmaz, Omer Faruk; Cevikcan, Emre
分享
收藏
Game theory-oriented approach for disassembly line worker assignment and balancing problem with multi-manned workstations
面向博弈论的多人员工作站拆卸线工人分配和平衡问题的方法
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2023-07-01
14
PRE
AI
Kose, Yildiz; Cevikcan, Emre; Ertemel, Sinan; Murat, Mirac
分享
收藏
An Interval Valued Pythagorean Fuzzy AHP-TOPSIS Integrated Model for Ergonomic Assessment of Setup Process under SMED
SUSTAINABILITY
IF
3.3
2022-10-25
5
OA
AI
Kose, Yildiz; Civan, Hatice Nida; Ayyildiz, Ertugrul; Cevikcan, Emre
分享
收藏
Axiomatic design for lean autonomous maintenance system: an application from textile industry
INTERNATIONAL JOURNAL OF LEAN SIX SIGMA
IF
3.7
2022-09-08
2
PRE
AI
Kose, Yildiz; Muftuoglu, Suleyman; Cevikcan, Emre; Durmusoglu, Mehmet Bulent
分享
收藏
Disassembly line design with multi-manned workstations: a novel heuristic optimisation approach
具有多人工作站的拆卸线设计: 一种新颖的启发式优化方法
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2019-03-08
41
PRE
AI
Cevikcan, Emre; Aslan, Dicle; Yeni, Fatma Betul
分享
收藏
A maritime safety on-board decision support system to enhance emergency evacuation on ferryboats
MARITIME POLICY & MANAGEMENT
IF
3.6
2019-02-18
19
PRE
AI
Sarvari, Peiman Alipour; Cevikcan, Emre; Celik, Metin; Ustundag, Alp; Ervural, Bilal
分享
收藏
A simulation-based methodology for the analysis of the effect of lean tools on energy efficiency: An application in power distribution industry
JOURNAL OF CLEANER PRODUCTION
IF
10
2019-02-01
61
PRE
AI
Baysan, Serdar; Kabadurmus, Ozgur; Cevikcan, Emre; Satoglu, Sule Itir; Durmusoglu, Mehmet Bulent
分享
收藏
Studies on emergency evacuation management for maritime transportation
MARITIME POLICY & MANAGEMENT
IF
3.6
2017-12-05
11
PRE
AI
Sarvari, Peiman Alipour; Cevikcan, Emre; Ustundag, Alp; Celik, Metin
分享
收藏
Axiomatic Design for Lean-oriented Occupational Health and Safety systems: An application in shipbuilding industry
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2016-10-01
27
PRE
AI
Babur, Ferhat; Cevikcan, Emre; Durmusoglu, M. Bulent
分享
收藏
MAXIMIZING THE VALUE OF RESIDENTIAL PROJECTS USING FUZZY RULE BASED LINEAR PROGRAMMING
management in engineering
IF
3.7
2016-07-12
4
OA
AI
Ustundag, Alp; Cevikcan, Emre
分享
收藏
The Effects of Environmental Risk Factors on City Life Cycle: A Link Analysis
HUMAN AND ECOLOGICAL RISK ASSESSMENT
IF
2.7
2015-02-03
6
PRE
AI
Isikli, Erkan; Ustundag, Alp; Cevikcan, Emre
分享
收藏
An integrated job release and scheduling approach on parallel machines: An application in electric wire-harness industry
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2014-10-01
11
PRE
AI
Cevikcan, Emre; Durmusoglu, M. Bulent
分享
收藏
Minimising utility work and utility worker transfers for a mixed-model assembly line
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2011-12-15
14
PRE
AI
Cevikcan, Emre; Durmusoglu, M. Bulent
分享
收藏
Integrating parts design characteristics and scheduling on parallel machines
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2011-09-01
11
PRE
AI
Cevikcan, Emre; Durmusoglu, M. Bulent; Baskak, Murat
分享
收藏
Fuzzy rule-based system for the economic analysis of RFID investments
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2010-07-01
37
PRE
AI
Ustundag, Alp; Kilinc, Mehmet Serdar; Cevikcan, Emre
分享
收藏
A team-oriented design methodology for mixed model assembly systems
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2009-03-01
38
PRE
AI
Cevikcan, Emre; Durmusoglu, M. Bulent; Unal, Murat E.
分享
收藏
研究方向
暂无研究方向
合作学者
合作期刊
M
Metin Çelik
H 指数: 33 · 论文数: 115
E
Ertuğrul Ayyıldız
H 指数: 26 · 论文数: 119
Ş
Şule Itır Satoğlu
H 指数: 20 · 论文数: 57
A
Alp Üstündağ
H 指数: 19 · 论文数: 87
Ö
Ömer Faruk Yılmaz
H 指数: 19 · 论文数: 57
查看更多