科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
J
Jung-Ho Yu
kwangwoon university
20
H指数
125
论文数
1.9K
被引数
0
相关解读
订阅
收录论文
29
发表时间
发表时间
IF
被引数
Effects of the Utilization of Risk Assessment Systems on Construction Workers’ Safety Consciousness, Safety Attitude, and Safety Behavior
利用风险评估系统对建筑工人安全意识,安全态度和安全行为的影响
Buildings
IF
3.1
2026-01-31
0
OA
AI
Seulki Lee; Youngho Choi; Daeil Kim; Junhyeok Kim; Jungho Yu
分享
收藏
A Potential Outlier Detection Model for Structural Crack Variation Using Big Data-Based Periodic Analysis
基于大数据周期性分析的潜在离群点检测模型,用于结构裂缝变化
Buildings 2025, Vol. 15, Page 3492
IF
3.1
2025-09-30
0
OA
AI
Jaemin Kim; Seongwoong Shin; Seulki Lee; Jungho Yu
分享
收藏
A Practical Image Augmentation Method for Construction Safety Using Object Range Expansion Synthesis
一种基于对象范围扩展合成的建筑施工安全实用图像增强方法
BUILDINGS
IF
3.1
2025-04-24
0
OA
AI
Kim, Jaemin; Wang, Ingook; Yu, Jungho; Lee, Seulki
分享
收藏
DfMA Integrated Assessment Model for Selecting Optimal Design Alternatives in OSC Projects
BUILDINGS
IF
3.1
2024-06-08
0
OA
AI
Jung, Seoyoung; Lee, Seulki; Yu, Jungho
分享
收藏
Experimental Study on Using Synthetic Images as a Portion of Training Dataset for Object Recognition in Construction Site
将合成图像作为训练数据集的一部分用于建筑工地目标识别的实验研究
BUILDINGS
IF
3.1
2024-05-17
2
OA
AI
Kim, Jaemin; Wang, Ingook; Yu, Jungho
分享
收藏
Comparison of OSC (Off-Site Construction) Level Measurement Methods
BUILDINGS
IF
3.1
2024-05-01
0
OA
AI
Im, Chulwoo; Kim, Jung-In; Kim, Inhan; Yu, Jungho
分享
收藏
Ontological inference process using AI-based object recognition for hazard awareness in construction sites
AUTOMATION IN CONSTRUCTION
IF
11.5
2023-09-01
8
PRE
AI
Lee, Seul-Ki; Yu, Jung-Ho
分享
收藏
Comparative Study on BIM Acceptance Model by Adoption Period
BUILDINGS
IF
3.1
2023-06-01
3
OA
AI
Yu, Jungho; Lee, Seulki
分享
收藏
Design for Manufacturing and Assembly (DfMA) Checklists for Off-Site Construction (OSC) Projects
SUSTAINABILITY
IF
3.3
2022-09-22
7
OA
AI
Jung, Seoyoung; Yu, Jungho
分享
收藏
Identification and Prioritization of Critical Success Factors for Off-Site Construction Using ISM and MICMAC Analysis
SUSTAINABILITY
IF
3.3
2021-08-09
19
OA
AI
Jung, Seoyoung; Lee, Seulki; Yu, Jungho
分享
收藏
Quantifying the Effectiveness of IoT Technologies for Accident Prevention
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2020-09-01
41
PRE
AI
Yeo, Chang Jae; Yu, Jung Ho; Kang, Youngcheol
分享
收藏
Automated management of green building material information using web crawling and ontology
AUTOMATION IN CONSTRUCTION
IF
11.5
2019-06-01
27
PRE
AI
Hong, Sim-Hee; Lee, Seul-Ki; Yu, Jung-Ho
分享
收藏
Exploring the Factor-Performance Relationship of Integrated Project Delivery Projects: A Qualitative Comparative Analysis
international journal of project management
IF
4.4
2019-03-17
17
PRE
AI
Yu, Jung Ho; Yoo, Seung Eun; Kim, Jung In; Kim, Tae Wan
分享
收藏
Identifying Effective Fugitive Dust Control Measures for Construction Projects in Korea
SUSTAINABILITY
IF
3.3
2018-04-17
31
OA
AI
Noh, Hyun-jun; Lee, Seul-ki; Yu, Jung-ho
分享
收藏
Integration of ifc objects and facility management work information using Semantic Web
AUTOMATION IN CONSTRUCTION
IF
11.5
2018-03-01
80
PRE
AI
Kim, Karam; Kim, Hyunjoo; Kim, Wooyoung; Kim, Changduk; Kim, Jaeyo; Yu, Jungho
分享
收藏
BIM IFC information mapping to building energy analysis (BEA) model with manually extended material information
AUTOMATION IN CONSTRUCTION
IF
11.5
2016-08-01
76
PRE
AI
Kim, Hyunjoo; Shen, Zhenhua; Kim, Inhan; Kim, Karam; Stumpf, Annette; Yu, Jungho
分享
收藏
Comparative Study of BIM Acceptance between Korea and the United States
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2016-03-01
70
PRE
AI
Lee, Seulki; Yu, Jungho
分享
收藏
A PROCESS TO DIVIDE CURVED WALLS IN IFC-BIM INTO SEGMENTED STRAIGHT WALLS FOR BUILDING ENERGY ANALYSIS
management in engineering
IF
3.7
2015-08-24
19
OA
AI
Kim, Karam; Yu, Jungho
分享
收藏
A process to divide curved walls in IFC-BIM into segmented straight walls for building energy (vol 22, pg 333, 2016)
management in engineering
IF
3.7
2015-08-24
0
OA
AI
Kim, Karam; Yu, Jungho
分享
收藏
Fuzzy-based composite indicator development methodology for evaluating overall project performance (vol 21, pg 343, 2015)
management in engineering
IF
3.7
2015-05-06
0
OA
AI
Yu, Jung-ho; Jeon, Me-yeon; Kim, Tae Wan
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
H
Hyunsoo Lee
H 指数: 36 · 论文数: 493
K
Karam Kim
H 指数: 36 · 论文数: 102
T
Tae Wan Kim
H 指数: 32 · 论文数: 334
H
Hyunjoo Kim
H 指数: 29 · 论文数: 140
J
Jae-Jun Kim
H 指数: 28 · 论文数: 315
查看更多