LiDAR-based temporal surface damage assessment of bridge infrastructure using efficient scan area planning基于LiDAR的桥梁基础设施时序表面损伤评估及高效扫描区域规划Automation in ConstructionIF11.52025-09-160PRE
Design phase collaborative risk management factors: a case study of a green rating system in South Africaconstruction engineering and managementIF3.92024-07-240OA
Identification of Key Design Phase-Related Risks in DBB Projects in the UAE-Towards Developing a BIM SolutionSUSTAINABILITYIF3.32023-04-142OA
Distilling agency in BIM-induced change in work practicesCONSTRUCTION INNOVATION-ENGLANDIF3.52021-03-248OA
Understanding BIM's impact on professional work practices using activity theoryCONSTRUCTION MANAGEMENT AND ECONOMICSIF3.32019-02-1023OAAI
New BIM Roles' Legitimacy and Changing Power Dynamics on BIM-Enabled ProjectsJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENTIF5.12017-09-0142PREAI
Case Study-Based Testing of Design Interface Management SystemJOURNAL OF MANAGEMENT IN ENGINEERINGIF72013-07-0115PREAI
A web-based system for design interface management of construction projectsAUTOMATION IN CONSTRUCTIONIF11.52010-03-0130PREAI