Survey Comparing Critical Path Method, Last Planner System, and Location-Based TechniquesJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENTIF5.12019-12-0140PREAI
Solving design management problems using lean design management: the role of trust使用精益设计管理解决设计管理问题: 信任的作用construction engineering and managementIF3.92019-08-0216PREAI
Real-time resource tracking for analyzing value-adding time in constructionAUTOMATION IN CONSTRUCTIONIF11.52019-08-0143OAAI
Applying Level of Detail in a BIM-Based Project: An Overall Process for Lean Design ManagementBUILDINGSIF3.12019-05-0120OAAI