科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
P
Parviz Fattahi
alzehra university
27
H指数
107
论文数
2.6K
被引数
0
相关解读
订阅
收录论文
23
发表时间
发表时间
IF
被引数
A flow shop scheduling problem incorporating a reconfigurable material handling Robot: A constraint programming approach
集成可重构物料搬运机器人的流水车间调度问题:一种约束规划方法
Expert Systems with Applications
IF
7.5
2026-10-02
0
PRE
AI
Sahar Akhgar; Parviz. Fattahi; Behdin Vahedi-Nouri; Abdolreza Roshani
分享
收藏
Exploring transfer learning techniques for classifying Alzheimer's disease with rs-fMRI
探索用于分类阿尔茨海默氏病的rs-fMRI迁移学习技术
Computers in Biology and Medicine
IF
6.3
2025-09-22
0
PRE
AI
Somayeh Abbasabadi; Parviz Fattahi; Mahdyeh Shiri
分享
收藏
An integrated blockchain-enabled multi-channel vaccine supply chain network under hybrid uncertainties
SCIENTIFIC REPORTS
IF
3.9
2024-10-01
0
OA
AI
Shiri, Mahdyeh; Fattahi, Parviz; Sogandi, Fatemeh
分享
收藏
A stochastic multi-period energy hubs through backup and storage systems: enhancing cost efficiency, and sustainability
CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY
IF
3.9
2023-12-01
2
PRE
AI
Kebria, Zohreh Shakeri; Fattahi, Parviz; Setak, Mostafa
分享
收藏
Joint optimisation of the maintenance and buffer stock policies considering back orders
international journal of systems science
IF
3.3
2023-02-05
12
PRE
AI
Aghdam, Sahra Sheydaei; Fattahi, Parviz; Hosseini, Seyed Mohammad Hassan; Babaeimorad, Samaneh; Sana, Shib Sankar
分享
收藏
An exact method for job sequencing in a mixed-model assembly line considering feeding lines based on the Benders decomposition approach
INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT
IF
2.6
2022-03-25
3
PRE
AI
Saadi, Anis; Fattahi, Parviz; Rahmanii, Donya; Hosseini, Seyed Mohammad Hassan; Sana, Shib Sankar
分享
收藏
Minimizing maximum tardiness on a single machine with family setup times and machine disruption
通过家庭设置时间和机器中断,最大限度地减少单台机器上的最大迟到
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2021-05-01
6
PRE
AI
Molaee, Ehsan; Sadeghian, Ramin; Fattahi, Parviz
分享
收藏
Bi-objective vibration damping optimization for congested location-pricing problem
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2016-06-01
28
OA
AI
Hajipour, Vahid; Farahani, Reza Zanjirani; Fattahi, Parviz
分享
收藏
A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
IF
4
2016-01-19
26
PRE
AI
Rabiee, M.; Jolai, F.; Asefi, H.; Fattahi, P.; Lim, S.
分享
收藏
A bi-objective continuous review inventory control model: Pareto-based meta-heuristic algorithms
APPLIED SOFT COMPUTING
IF
6.6
2015-07-01
50
PRE
AI
Fattahi, Parviz; Hajipour, Vahid; Nobari, Arash
分享
收藏
A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2014-09-16
14
PRE
AI
Samouei, Parvaneh; Kheirkhah, Amir Saman; Fattahi, Parviz
分享
收藏
Multi-objective meta-heuristics to solve three-stage assembly flow shop scheduling problem with machine availability constraints
多目标元启发式求解具有机器可用性约束的三阶段装配流水车间调度问题
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2014-08-19
32
PRE
AI
Shoaardebili, Niloofar; Fattahi, Parviz
分享
收藏
Two hybrid tabu search-firefly algorithms for the capacitated job shop scheduling problem with sequence-dependent setup cost
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
IF
4
2014-02-06
24
PRE
AI
Rohaninejad, Mohammad; Kheirkhah, Amir Saman; Nouri, Behdin Vahedi; Fattahi, Parviz
分享
收藏
A mathematical model and genetic algorithm to cyclic flexible job shop scheduling problem
JOURNAL OF INTELLIGENT MANUFACTURING
IF
7.4
2013-10-24
36
PRE
AI
Jalilvand-Nejad, Amir; Fattahi, Parviz
分享
收藏
Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
IF
4
2013-07-01
4
PRE
AI
Ramezanian, Reza; Saidi-Mehrabad, Mohammad; Fattahi, Parviz
分享
收藏
Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2013-06-01
50
PRE
AI
Nouri, Behdin Vahedi; Fattahi, Parviz; Ramezanian, Reza
分享
收藏
MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints
具有可用性约束的多阶段容量控制批量和调度问题的MIP公式和启发式方法
JOURNAL OF MANUFACTURING SYSTEMS
IF
14.2
2013-04-01
44
PRE
AI
Ramezanian, Reza; Saidi-Mehrabad, Mohammad; Fattahi, Parviz
分享
收藏
Minimizing total flow time for the non-permutation flow shop scheduling problem with learning effects and availability constraints
JOURNAL OF MANUFACTURING SYSTEMS
IF
14.2
2013-01-01
36
PRE
AI
Vahedi-Nouri, Behdin; Fattahi, Parviz; Ramezanian, Reza
分享
收藏
Cost-oriented two-sided assembly line balancing problem: A simulated annealing approach
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
IF
4
2012-08-01
51
PRE
AI
Roshani, Abdolreza; Fattahi, Parviz; Roshani, Abdolhassan; Salehi, Mohsen; Roshani, Arezoo
分享
收藏
Cyclic scheduling of a robotic flexible cell with load lock and swap
JOURNAL OF INTELLIGENT MANUFACTURING
IF
7.4
2011-02-02
15
PRE
AI
Jolai, Fariborz; Foumani, Mehdi; Tavakoli-Moghadam, Reza; Fattahi, Parviz
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
F
Fariborz Jolai
H 指数: 55 · 论文数: 371
S
Shib Sankar Sana
H 指数: 52 · 论文数: 269
R
Reza Zanjirani Farahani
H 指数: 44 · 论文数: 151
J
Jafar Razmi
H 指数: 37 · 论文数: 168
S
Samsung Lim
H 指数: 32 · 论文数: 217
查看更多