科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
E
Enrique Gerstl
Hebrew University of Jerusalem
14
H指数
29
论文数
469
被引数
0
相关解读
订阅
收录论文
15
发表时间
发表时间
IF
被引数
Coordinating scheduling and rejection decisions in a two-machine flow shop scheduling problem
在两机流水车间调度问题中协调调度和拒绝决策
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2024-08-01
1
PRE
AI
Shabtay, Dvir; Gerstl, Enrique
分享
收藏
The single machine CON problem with unavailability period
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2020-01-06
8
PRE
AI
Gerstl, Enrique; Mosheiov, Gur
分享
收藏
Semi-V-shape property for two-machine no-wait proportionate flow shop problem with TADC criterion
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2018-05-14
15
PRE
AI
Kovalev, Sergey; Kovalyov, Mikhail Y.; Mosheiov, Gur; Gerstl, Enrique
分享
收藏
Scheduling on a proportionate flowshop to minimise total late work
按比例安排流水车间,以最大程度地减少总延迟工作
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2018-04-03
23
PRE
AI
Gerstl, Enrique; Mor, Baruch; Mosheiov, Gur
分享
收藏
Minmax scheduling with acceptable lead-times: Extensions to position-dependent processing times, due-window and job rejection
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2017-07-01
28
PRE
AI
Gerstl, Enrique; Mor, Baruch; Mosheiov, Gur
分享
收藏
Minmax weighted earliness-tardiness with identical processing times and two competing agents
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2017-05-01
3
PRE
AI
Gerstl, Enrique; Mosheiov, Gur
分享
收藏
Single machine scheduling problems with generalised due-dates and job-rejection
具有广义到期日和作业拒绝的单机调度问题
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2016-12-20
32
PRE
AI
Gerstl, Enrique; Mosheiov, Gur
分享
收藏
Scheduling with two competing agents to minimize total weighted earliness
与两个竞争的代理进行调度,以最大程度地减少总加权提前
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2016-09-16
2
PRE
AI
Gerstl, Enrique; Mor, Baruch; Mosheiov, Gur
分享
收藏
A two-stage flexible flow shop problem with unit-execution-time jobs and batching
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2014-12-01
5
PRE
AI
Gerstl, Enrique; Mosheiov, Gur
分享
收藏
A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2013-11-01
12
PRE
AI
Gerstl, Enrique; Mosheiov, Gur
分享
收藏
Minmax due-date assignment with a time window for acceptable lead-times
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2013-09-20
11
PRE
AI
Gerstl, Enrique; Mosheiov, Gur
分享
收藏
Due-window assignment problems with unit-time jobs
APPLIED MATHEMATICS AND COMPUTATION
IF
3.4
2013-09-01
10
PRE
AI
Gerstl, Enrique; Mosheiov, Gur
分享
收藏
Due-window assignment with identical jobs on parallel uniform machines
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2013-08-01
15
PRE
AI
Gerstl, Enrique; Mosheiov, Gur
分享
收藏
Scheduling problems with two competing agents to minimized weighted earliness-tardiness
具有两个竞争代理的调度问题,以最大程度地减少加权的迟到时间
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2013-01-01
39
PRE
AI
Gerstl, Enrique; Mosheiov, Gur
分享
收藏
Scheduling job classes on uniform machines
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2012-09-01
2
PRE
AI
Gerstl, Enrique; Mosheiov, Gur
分享
收藏
研究方向
暂无研究方向
合作学者
合作期刊
G
Gur Mosheiov
H 指数: 36 · 论文数: 156
M
Mikhail Y. Kovalyov
H 指数: 36 · 论文数: 290
D
Dvir Shabtay
H 指数: 30 · 论文数: 122
B
Baruch Mor
H 指数: 24 · 论文数: 77
G
Gur Mosheiov
H 指数: 16 · 论文数: 31
查看更多