Low Voltage Grid Operation Scheduling Considering Forecast Uncertainty14TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING MODELS IN INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS (SOCO 2019)IF02019-05-010PREAI
Modeling and solving the non-smooth arc routing problem with realistic soft constraints (vol 98, pg 205, 2018)EXPERT SYSTEMS WITH APPLICATIONSIF7.52018-08-010PREAI
Modeling and solving the non-smooth arc routing problem with realistic soft constraintsEXPERT SYSTEMS WITH APPLICATIONSIF7.52018-05-0111OAAI
Combining statistical learning with metaheuristics for the Multi-Depot Vehicle Routing Problem with market segmentationCOMPUTERS & INDUSTRIAL ENGINEERINGIF6.52016-04-0163OAAI
A comparative note on the relaxation algorithms for the linear semi-infinite feasibility problemANNALS OF OPERATIONS RESEARCHIF4.52016-02-166PREAI
A BRILS metaheuristic for non-smooth flow-shop problems with failure-risk costsEXPERT SYSTEMS WITH APPLICATIONSIF7.52016-02-0132OAAI
Comparative study of RPSALG algorithm for convex semi-infinite programmingComputational Optimization and ApplicationsIF22014-06-2011OA
Deterministic and stochastic assessment of the harmonic currents consumed by discharge lampsELECTRIC POWER SYSTEMS RESEARCHIF4.22011-01-014PREAI
Three-phase full-wave rectifier study with experimental measurementsELECTRIC POWER SYSTEMS RESEARCHIF4.22009-04-010PRE