Target-based computer-assisted orchestration: Complexity and approximation algorithms基于目标的计算机辅助编排: 复杂性和近似算法EUROPEAN JOURNAL OF OPERATIONAL RESEARCHIF62023-02-012PRE
On Routing and Spectrum Assignment in Rings环上的路由和频谱分配JOURNAL OF LIGHTWAVE TECHNOLOGYIF4.82015-01-019PREAI
Spectrum Assignment in Optical Networks: A Multiprocessor Scheduling PerspectiveJOURNAL OF OPTICAL COMMUNICATIONS AND NETWORKINGIF4.32014-07-3137PREAI
A Note on Multiprocessor Speed Scaling with Precedence Constraintsproceedings of theIF02014-06-219PREAI
Speed scaling with power down scheduling for agreeable deadlinesSUSTAINABLE COMPUTING-INFORMATICS & SYSTEMSIF5.72012-12-0120OAAI
Bicriteria scheduling for contiguous and non contiguous parallel tasksANNALS OF OPERATIONS RESEARCHIF4.52007-12-121PREAI
How good are SPT schedules for fair optimality criteriaANNALS OF OPERATIONS RESEARCHIF4.52007-12-018OA
A multi-start dynasearch algorithm for the time dependent single-machine total weighted tardiness scheduling problemEUROPEAN JOURNAL OF OPERATIONAL RESEARCHIF62005-04-0114OAAI
Scheduling tasks with small communication delays for clusters of processorsANNALS OF OPERATIONS RESEARCHIF4.52004-07-012PREAI
Scheduling algorithms for parallel Gaussian elimination with communication costsIEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMSIF61998-07-0130PREAI
Minimizing the schedule length for a parallel 3D-grid precedence graphEUROPEAN JOURNAL OF OPERATIONAL RESEARCHIF61996-12-010PREAI
Minimizing the overhead for some tree-scheduling problemsEUROPEAN JOURNAL OF OPERATIONAL RESEARCHIF61996-10-010PREAI
On the complexity of scheduling with large communication delaysEUROPEAN JOURNAL OF OPERATIONAL RESEARCHIF61996-10-0116PREAI