Application of an artificial horizontal aquiclude with slurry diaphragm walls for groundwater control in deep excavations near high-speed railways高速铁路附近深基坑地下水控制中人工水平隔水层与泥浆帷幕墙的应用Tunnelling and Underground Space TechnologyIF7.42026-09-010PRE
Automated borehole layout adjustment method in drill-and-blast tunneling: A hierarchical constraint propagation framework钻爆隧道自动钻孔布置调整方法: 分层约束传播框架Tunnelling and Underground Space TechnologyIF7.42026-01-180PRE
Anisotropic Mechanical Properties of Sericite Phyllite Under Dry and Saturated ConditionsROCK MECHANICS AND ROCK ENGINEERINGIF6.62025-03-010PRE
Analytical Viscoelastic Solution for Double-lining Tunnel Under a Non-hydrostatic Stress Field Considering Creep Characteristic of ShotcretetROCK MECHANICS AND ROCK ENGINEERINGIF6.62024-12-250PRE
Method of fabricating artificial rock specimens based on extrusion free forming (EFF) 3D printingJOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERINGIF10.22024-04-010OAAI
Mechanical response of inclined TBM tunnel due to drainage settlement of deep sandstone aquiferTUNNELLING AND UNDERGROUND SPACE TECHNOLOGYIF7.42022-04-0116PRE
A method to obtain artificial sandstone joint specimens for the description of permeability anisotropy-based joint shear deformationGEOMECHANICS AND GEOPHYSICS FOR GEO-ENERGY AND GEO-RESOURCESIF4.22021-04-292PREAI
Protective coal pillar design for segmental lining-supported TBM mine tunnels using physical model testsGEOMECHANICS AND GEOPHYSICS FOR GEO-ENERGY AND GEO-RESOURCESIF4.22021-02-084PREAI
Enhanced rock breakage by pulsed laser induced cavitation bubbles: preliminary experimental observations and conclusions脉冲激光诱导空化气泡增强岩石破碎: 初步实验观察和结论GEOMECHANICS AND GEOPHYSICS FOR GEO-ENERGY AND GEO-RESOURCESIF4.22020-02-0435PREAI
Influence of consolidation settlement on the stability of inclined TBM tunnels in a coal mineTUNNELLING AND UNDERGROUND SPACE TECHNOLOGYIF7.42017-10-0118PREAI