arrow
返回
L

Lucas P. Veelenturf

erasmus university

19H指数
44论文数
2.5K被引数
收录论文 17
发表时间
err分享
err收藏
err分享
err收藏
Integrated optimization of capacitated train rescheduling and passenger reassignment under disruptions
err2021-04-01
err25
errOAAI
errHong, Xin; Meng, Lingyun; D'Ariano, Andrea; Veelenturf, Lucas P.; Long, Sihui; Corman, Francesco
err分享
err收藏
The time-dependent pickup and delivery problem with time windows
err2018-10-01
err79
errOAAI
errSun, Peng; Veelenturf, Lucas P.; Hewitt, Mike; Van Woensel, Tom
err分享
err收藏
err分享
err收藏
Capacitated network-flow approach to the evacuation-location problem
err2018-01-01
err13
errOAAI
errFarahani, Mina Mazraeh; Chaharsooghi, S. Kamal; Van Woensel, T.; Veelenturf, Lucas P.
err分享
err收藏
Application of an iterative framework for real-time railway rescheduling
err2017-02-01
err36
errOAAI
errDollevoet, Twan; Huisman, Dennis; Kroon, Leo G.; Veelenturf, Lucas P.; Wagenaar, Joris C.
err分享
err收藏
A Railway Timetable Rescheduling Approach for Handling Large-Scale Disruptions
err2016-08-01
err143
errOAAI
errVeelenturf, Lucas P.; Kidd, Martin P.; Cacchiani, Valentina; Kroon, Leo G.; Toth, Paolo
err分享
err收藏
A Quasi-Robust Optimization Approach for Crew Rescheduling
err2016-02-01
err31
PREAI
errVeelenturf, Lucas P.; Potthoff, Daniel; Huisman, Dennis; Kroon, Leo G.; Maroti, Gabor; Wagelmans, Albert P. M.
err分享
err收藏
An overview of recovery models and algorithms for real-time railway rescheduling
err2014-05-01
err495
PREAI
errCacchiani, Valentina; Huisman, Dennis; Kidd, Martin; Kroon, Leo; Toth, Paolo; Veelenturf, Lucas; Wagenaar, Joris
err分享
err收藏
Railway crew rescheduling with retiming
err2012-02-01
err48
errOAAI
errVeelenturf, Lucas P.; Potthoff, Daniel; Huisman, Dennis; Kroon, Leo G.
err分享
err收藏