科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
L
Levi R. Abreu
Universidade Federal do Ceara
11
H指数
34
论文数
405
被引数
0
相关解读
订阅
收录论文
11
发表时间
发表时间
IF
被引数
A comparative computational study for single-machine problems with controllable processing times and limited resource consumption
可控加工时间和有限资源消耗的单机问题的比较计算研究
Annals of Operations Research
IF
4.5
2026-01-08
0
PRE
AI
Levi R. Abreu; Bruno A. Prata
分享
收藏
A Q-learning-based variable greedy algorithm to minimize the sum of total earliness and tardiness in a no-wait flowshop scheduling problem
基于Q-learning的变贪婪算法,用于最小化无等待流水车间调度问题中的总提前与总延迟之和
Computers & Operations Research
IF
4.3
2026-01-06
0
PRE
AI
Levi R. Abreu; Bruno A. Prata; Jose M. Framinan
分享
收藏
A comparative computational study for parallel-machine problems with sustainable manufacturing constraints
并行机问题在可持续制造约束下的比较计算研究
Journal of Combinatorial Optimization
IF
1.1
2025-11-29
0
PRE
AI
Abreu, Levi R.; Prata, Bruno A.
分享
收藏
A systematic review of permutation flow shop scheduling with due-date-related objectives
排列流水车间调度中与交货期相关的目标的系统综述
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2025-05-01
0
PRE
AI
Prata, Bruno de Athayde; de Abreu, Levi Ribeiro; Fernandez-Viagas, Victor
分享
收藏
A constraint programming-based iterated greedy algorithm for the open shop with sequence-dependent processing times and makespan minimization
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2023-12-01
4
PRE
AI
Abreu, Levi R.; Prata, Bruno A.; Nagano, Marcelo S.; Framinan, Jose M.
分享
收藏
A two-stage fuzzy inference model to determine raw materials criticality in life sciences industries
operations management
IF
5.3
2023-06-21
0
PRE
AI
Abreu, Levi R. R.; Nagano, Marcelo S. S.
分享
收藏
A new two-stage constraint programming approach for open shop scheduling problem with machine blocking
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2022-12-15
3
PRE
AI
Abreu, Levi R.; Nagano, Marcelo S.; Prata, Bruno A.
分享
收藏
A novel BRKGA for the customer order scheduling with missing operations to minimize total tardiness
SWARM AND EVOLUTIONARY COMPUTATION
IF
8.5
2022-12-01
6
OA
AI
de Abreu, Levi Ribeiro; Prata, Bruno de Athayde; Gomes, Allan Costa; Braga-Santos, Stephanie Alencar; Nagano, Marcelo Seido
分享
收藏
A new hybridization of adaptive large neighborhood search with constraint programming for open shop scheduling with sequence-dependent setup times
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2022-06-01
20
PRE
AI
Abreu, Levi R.; Nagano, Marcelo S.
分享
收藏
New efficient heuristics for scheduling open shops with makespan minimization
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2022-06-01
14
OA
AI
Abreu, Levi R.; Prata, Bruno A.; Framinan, Jose M.; Nagano, Marcelo S.
分享
收藏
A genetic algorithm for scheduling open shops with sequence-dependent setup times
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2020-01-01
68
OA
AI
Abreu, Levi R.; Cunha, Jesus O.; Prata, Bruno A.; Framinan, Jose M.
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
J
José M. Framiñán
H 指数: 50 · 论文数: 269
M
Marcelo Seido Nagano
H 指数: 30 · 论文数: 330
V
Victor Fernández-Viagas
H 指数: 27 · 论文数: 93
B
Bruno de Athayde Prata
H 指数: 18 · 论文数: 142
J
Jesus O. Cunha
H 指数: 6 · 论文数: 11
查看更多