科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
A
Anis Gharbi
king saud university
19
H指数
63
论文数
961
被引数
0
相关解读
订阅
收录论文
26
发表时间
发表时间
IF
被引数
Integer Linear Programming-based constructive heuristics for Space Division Multiplexing networks
基于整数线性规划的构造性启发式算法,用于空间分割多路复用网络
Journal of Engineering Research
IF
2.2
2025-12-01
0
OA
AI
Mrad, Mehdi; Suryahatmaja, Umar S.; Elsayed, Abdelrahman Ossama; Gharbi, Anis; Esmail, Maged Abdullah
分享
收藏
Arc Flow Formulation for Efficient Uniform Parallel Machine Scheduling
SYMMETRY-BASEL
IF
2.2
2025-11-02
0
OA
AI
Bamatraf, Khaled; Gharbi, Anis
分享
收藏
A Monte Carlo-Based Framework for Two-Stage Stochastic Programming: Application to Bond Portfolio Optimization
ENTROPY
IF
2
2025-10-30
0
PRE
AI
Albaqami, Hissah; Mrad, Mehdi; Gharbi, Anis; Subasi, Munevver Mine
分享
收藏
Heuristic solutions to optimize the traffic routing in space division multiplexing networks
启发式算法优化空间分集复用网络中的交通路由
JOURNAL OF ENGINEERING RESEARCH
IF
2.2
2025-09-01
1
OA
AI
Mrad, Mehdi; Suryahatmaja, Umar S.; Elsayed, Abdelrahman Ossama; Fathallah, Habib; Gharbi, Anis
分享
收藏
Soccer Match Algorithm for Global Optimization: A Contender Metaheuristic
IEEE ACCESS
IF
3.6
2024-01-01
0
OA
AI
Ben Ammar, Roua; Gharbi, Anis; Zied Babai, Mohamed
分享
收藏
Two-stage no-wait hybrid flow shop with inter-stage flexibility for operating room scheduling
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2022-06-01
8
OA
AI
Azaiez, Mohamed-Naceur; Gharbi, Anis; Kacem, Imed; Makhlouf, Yosra; Masmoudi, Malek
分享
收藏
A Column Generation-Based Lower Bound for the Minimum Sum Coloring Problem
IEEE ACCESS
IF
3.6
2020-01-01
2
OA
AI
Mrad, Mehdi; Harrabi, Olfa; Siala, Jouhaina Chaouachi; Gharbi, Anis
分享
收藏
Production and subcontracting control for an unreliable manufacturing system with setups
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2019-06-20
3
PRE
AI
Assid, M.; Gharbi, A.; Hajji, A.
分享
收藏
A Computational Study of the Two-Machine No-Wait Flow Shop Scheduling Problem Subject to Unequal Release Dates and Non-Availability Constraints
IEEE ACCESS
IF
3.6
2018-01-01
8
OA
AI
Labidi, Mohamed; Kooli, Anis; Ladhari, Talel; Gharbi, Anis; Suryahatmaja, Umar S.
分享
收藏
Enhanced lower bounds and exact procedures for total completion time minimization in a two-machine permutation flowshop with release dates
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
IF
2.9
2017-05-17
4
PRE
AI
Mrad, Mehdi; Chalghoumi, Sabrine; Ladhari, Talel; Gharbi, Anis
分享
收藏
New Efficient Lower Bound for the Hybrid Flow Shop Scheduling Problem With Multiprocessor Tasks
IEEE ACCESS
IF
3.6
2017-01-01
13
OA
AI
Hidri, Lotfi; Gharbi, Anis
分享
收藏
Modeling of the microstructural properties of (x)ZnO(1-x)Fe2O3 nanocrystallines by artificial neural network and response surface methodology
MEASUREMENT
IF
5.6
2017-01-01
4
PRE
AI
Louly, M. A.; Lemine, O. M.; Gharbi, A.
分享
收藏
An optimization-based heuristic for the machine reassignment problem
机器重新分配问题的基于优化的启发式方法
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2015-09-24
5
PRE
AI
Mrad, Mehdi; Gharbi, Anis; Haouari, Mohamed; Kharbeche, Mohamed
分享
收藏
An Environmental Hedging Point Policy to control production rate and emissions in unreliable manufacturing systems
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2014-08-20
28
OA
AI
Ben-Salem, A.; Gharbi, A.; Hajji, A.
分享
收藏
The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2013-11-01
21
PRE
AI
Gharbi, Anis; Ladhari, Talel; Msakni, Mohamed Kais; Serairi, Mehdi
分享
收藏
Optimal production control policy in unreliable batch processing manufacturing systems with transportation delay
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2013-01-01
19
OA
AI
Bouslah, B.; Gharbi, A.; Pellerin, R.; Hajji, A.
分享
收藏
Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
IF
7.2
2011-12-01
47
PRE
AI
Berthaut, F.; Gharbi, A.; Dhouib, K.
分享
收藏
Jackson's semi-preemptive scheduling on a single machine
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2010-12-01
7
PRE
AI
Gharbi, Anis; Labidi, Mohamed
分享
收藏
Control of a repair and overhaul system with probabilistic parts availability
PRODUCTION PLANNING & CONTROL
IF
5.4
2009-02-14
6
PRE
AI
Berthaut, F.; Pellerin, R.; Gharbi, A.
分享
收藏
Joint production and supply control in three levels flexible manufacturing systems
JOURNAL OF INTELLIGENT MANUFACTURING
IF
7.4
2008-11-19
5
PRE
AI
Hajji, A.; Gharbi, A.; Kenne, J. P.
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
R
R. Ammar
H 指数: 58 · 论文数: 429
J
Jean‐Pierre Kenné
H 指数: 39 · 论文数: 248
M
Mohamed Haouari
H 指数: 39 · 论文数: 227
R
Robert Pellerin
H 指数: 35 · 论文数: 257
M
M. Zied Babaï
H 指数: 34 · 论文数: 110
查看更多