A novel approach for construction disputes causal inferences based on empirical data: a case-controlled method combined with Bradford Hill criteriaconstruction engineering and managementIF3.92023-06-051PRE
A contingency approach for time-cost trade-off in construction projects based on machine learning techniquesconstruction engineering and managementIF3.92023-05-294PRE
Identifying Critical Dispute Causes in the Construction Industry: A Cross-Regional Comparative Study between China and the UKJOURNAL OF MANAGEMENT IN ENGINEERINGIF72023-03-0114OA
Adopting BIM to Facilitate Dispute Management in the Construction Industry: A Conceptual Framework DevelopmentJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENTIF5.12023-01-0118PRE
Payment Issues in China's Construction Industry: Nature, Causes, and a Predictive ModelJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENTIF5.12023-01-015PRE
How International Construction Arbitrators Make Their Decisions: Status of Commercial Norms and International Construction LawJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENTIF5.12022-09-011PRE
Auditing Construction Cost from an In-Process Perspective Based on a Bayesian Predictive ModelJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENTIF5.12022-04-014PRE
A Bayesian belief network predictive model for construction delay avoidance in the UKconstruction engineering and managementIF3.92021-05-199PRE
To insist or to concede? Contractors' behavioural strategies when handling disputed claimsconstruction engineering and managementIF3.92019-02-2823OAAI
A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine: A perspective from the industryconstruction engineering and managementIF3.92018-03-1917OAAI