科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
K
Keith R. Molenaar
University of Colorado System
39
H指数
230
论文数
5.6K
被引数
0
相关解读
订阅
收录论文
64
发表时间
发表时间
IF
被引数
Green Public Procurement in Civil Infrastructure Construction: Current Performance and Main Project Characteristics
民用基础设施建设绿色公共采购: 现状与主要项目特点
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2023-09-01
2
PRE
AI
Montalban-Domingo, Laura; Torres-Machi, Cristina; Sanz-Benlloch, Amalia; Pellicer, Eugenio; Molenaar, Keith R.
分享
收藏
Assessing social performance of construction companies in public-works procurement: Data envelopment analysis based on the benefit of the doubt approach
ENVIRONMENTAL IMPACT ASSESSMENT REVIEW
IF
11.2
2022-09-01
10
OA
AI
Montalban-Domingo, Laura; Garcia-Segura, Tatiana; Sanz-Benlloch, Amalia; Pellicer, Eugenio; Torres-Machi, Cristina; Molenaar, Keith
分享
收藏
Methodological Consistency for Quantitative Analysis and Reporting in Project Delivery System Performance Research
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2022-09-01
4
PRE
AI
Franz, Bryan; Leicht, Robert; El Asmar, Mounir; Molenaar, Keith
分享
收藏
Roadway design and construction in infrastructure limited contexts: a risk breakdown structure
international entrepreneurship and management journal
IF
3.4
2022-05-16
3
PRE
AI
Beardmore, D. C.; Molenaar, Keith R.
分享
收藏
Importance of Noncost Criteria Weighing in Best-Value Design-Build US Highway Projects
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2021-07-01
7
OA
AI
Calahorra-Jimenez, Maria; Torres-Machi, Cristina; Chamorro, Alondra; Alarcon, Luis F.; Molenaar, Keith
分享
收藏
Structured Approach for Best-Value Evaluation Criteria: US Design-Build Highway Procurement (vol 36, 04020086, 2020)
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2021-07-01
0
OA
AI
Calahorra-Jimenez, Maria; Molenaar, Keith; Torres-Machi, Cristina; Chamorro, Alondra; Alarcon, Luis F.
分享
收藏
Challenges in Engineering Estimates for Best Value Design Build Highway Projects
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2021-07-01
3
OA
AI
Gaikwad, Suraj V.; Calahorra-Jimenez, Maria; Molenaar, Keith R.; Torres-Machi, Cristina
分享
收藏
Structured Approach for Best-Value Evaluation Criteria: US Design-Build Highway Procurement
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2020-11-01
17
OA
AI
Calahorra-Jimenez, Maria; Molenaar, Keith; Torres-Machi, Cristina; Chamorro, Alondra; Alarcon, Luis F.
分享
收藏
Cost Implications of Indefinite Delivery-Indefinite Quantity Contracting in the US Defense Sector
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2020-09-01
8
PRE
AI
Stanford, M. Scott; Molenaar, Keith R.
分享
收藏
Revisiting Project Delivery System Performance from 1998 to 2018
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2020-09-01
34
PRE
AI
Franz, Bryan; Molenaar, Keith R.; Roberts, Bradley A. M.
分享
收藏
Modeling Supply Chain Integration in an Integrated Project Delivery System
集成项目交付系统中的供应链集成建模
SUSTAINABILITY
IF
3.3
2020-06-23
9
OA
AI
Mesa, Harrison A.; Molenaar, Keith R.; Alarcon, Luis F.
分享
收藏
Strategic development of flexible manufacturing facilities
construction engineering and management
IF
3.9
2020-01-16
7
PRE
AI
Madson, Katherine M.; Franz, Bryan; Molenaar, Keith R.; Kremer, Gul Okudan
分享
收藏
Comparing Contract Administration Functions for Alternative and Traditional Delivery of Highway Projects
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2020-01-01
24
OA
AI
Papajohn, Dean; El Asmar, Mounir; Molenaar, Keith R.; Alleman, Doug
分享
收藏
Contract Administration Tools for Design-Build and Construction Manager/General Contractor Highway Projects
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2019-11-01
19
PRE
AI
Papajohn, Dean; El Asmar, Mounir; Molenaar, Keith R.
分享
收藏
Comparative analysis between integrated project delivery and lean project delivery
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT
IF
7.5
2019-04-01
66
PRE
AI
Mesa, Harrison A.; Molenaar, Keith R.; Alarcon, Luis F.
分享
收藏
Determining Contingencies in the Management of Construction Projects
确定建设项目管理中的或有事项
international journal of project management
IF
4.4
2019-02-11
18
PRE
AI
Ortiz, Jose I.; Pellicer, Eugenio; Molenaar, Keith R.
分享
收藏
Examination of Project Duration, Project Intensity, and Timing of Cost Certainty in Highway Project Delivery Methods
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2019-01-01
46
PRE
AI
Antoine, Arthur L. C.; Alleman, Douglas; Molenaar, Keith R.
分享
收藏
Influence of Interorganizational Coordination on Lifecycle Design Decision Making: Comparative Case Study of Public-Private Partnership Highway Projects
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2018-09-01
34
PRE
AI
Antillon, Eric I.; Garvin, Michael J.; Molenaar, Keith R.; Javernick-Will, Amy
分享
收藏
State-of-practice for risk-based quality assurance in state departments of transportation
construction engineering and management
IF
3.9
2018-08-09
18
PRE
AI
Oechler, Erick; Molenaar, Keith R.; Hallowell, Matthew; Scott, Sidney
分享
收藏
MANAGEMENT OF TIME AND COST CONTINGENCIES IN CONSTRUCTION PROJECTS: A CONTRACTOR PERSPECTIVE
management in engineering
IF
3.7
2018-06-15
14
OA
AI
Ortiz, Jose, I; Pellicer, Eugenio; Molenaar, Keith R.
分享
收藏
研究方向
暂无研究方向
合作学者
合作期刊
A
Albert P.C. Chan
H 指数: 95 · 论文数: 988
J
Jian Zuo
H 指数: 91 · 论文数: 730
M
Martin Skitmore
H 指数: 79 · 论文数: 797
B
Balaji Rajagopalan
H 指数: 70 · 论文数: 511
M
Matthew R. Hallowell
H 指数: 50 · 论文数: 156
查看更多