A double genetic algorithm for the MRCPSP/max
DOI:10.1016/j.cor.2009.09.019.png)
摘要
En 中文
This paper presents a heuristic solution procedure for a very general resource-constrained project scheduling problem. Here, multiple execution modes are available for the individual activities of the project. In addition, minimum as well as maximum time lags between different activities may be given. The objective is to determine a mode and a start time for each activity such that the temporal and resource constraints are met and the project duration is minimised. Project scheduling problems of this type occur e.g. in process industries. The heuristic is a two-phased genetic algorithm with different representation, fitness, crossover operator, etc., in each of them. One of the contributions of the paper is the optimisation in the first phase of a problem dual to the original, the searching for the best modes of the activities. Computational results show that the algorithm outperforms the state-of-the-art algorithms in medium and large instances. (C) 2009 Elsevier Ltd. All rights reserved.
Keyword:
Resource-constrained project scheduling
Maximum time lags
Multi-mode case
Genetic algorithm
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
C
IF:
4.3
论文数:
6.5K
被引数:
1.8W
机构
引用论文
Optimised Anaesthesia to Reduce Post Operative Cognitive Decline (POCD) in Older Patients Undergoing Elective Surgery, a Randomised Controlled Trial
PLoS ONE
IF0
The multi-mode resource-constrained project scheduling problem with generalized precedence relations