科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
F
Francisco Ballestı́n
University of Valencia
18
H指数
30
论文数
1.6K
被引数
0
相关解读
订阅
收录论文
14
发表时间
发表时间
IF
被引数
A multistage heuristic for storage and retrieval problems in a warehouse with random storage
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH
IF
2.9
2017-09-18
17
PRE
AI
Ballestin, Francisco; Perez, Angeles; Quintanilla, Sacramento
分享
收藏
Static and dynamic policies with RFID for the scheduling of retrieval and storage warehouse operations
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2013-12-01
31
PRE
AI
Ballestin, Francisco; Perez, Angeles; Lino, Pilar; Quintanilla, Sacramento; Valls, Vicente
分享
收藏
Looking for the best modes helps solving the MRCPSP/max
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2013-02-01
14
PRE
AI
Ballestin, Francisco; Barrios, Agustin; Valls, Vicente
分享
收藏
Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems
资源受限项目调度问题多目标优化的理论和实践基础
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2011-01-01
48
PRE
AI
Ballestin, Francisco; Blanco, Rosa
分享
收藏
A double genetic algorithm for the MRCPSP/max
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2011-01-01
34
PRE
AI
Barrios, Agustin; Ballestin, Francisco; Valls, Vicente
分享
收藏
Scheduling projects with limited number of preemptions
用有限数量的抢占来调度项目
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2009-11-01
33
PRE
AI
Ballestin, Francisco; Valls, Vicente; Quintanilla, Sacramento
分享
收藏
An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2008-10-02
28
PRE
AI
Ballestin, Francisco; Trautmann, Norbert
分享
收藏
Pre-emption in resource-constrained project scheduling
资源受限项目调度中的抢占
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2008-09-01
65
PRE
AI
Ballestin, Francisco; Valls, Vicente; Quintanilla, Sacramento
分享
收藏
Meta-heuristics for stable scheduling on a single machine
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2008-07-01
6
PRE
AI
Ballestin, Francisco; Leus, Roel
分享
收藏
A hybrid genetic algorithm for the resource-constrained project scheduling problem
一种求解资源受限项目调度问题的混合遗传算法
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2008-03-01
200
PRE
AI
Valls, Vicente; Ballestin, Francisco; Quintanilla, Sacramento
分享
收藏
Heuristic procedures for reactive project scheduling
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2007-02-01
70
OA
AI
Van de Vonder, Stijn; Ballestin, Francisco; Demeulemeester, Erik; Herroelen, Willy
分享
收藏
Justification and RCPSP:: A technique that pays
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2005-09-01
223
PRE
AI
Valls, V; Ballestín, F; Quintanilla, S
分享
收藏
A population-based approach to the resource-constrained project scheduling problem
一种基于人口的资源受限项目调度方法
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2004-10-01
79
PRE
AI
Valls, V; Ballestín, F; Quintanilla, S
分享
收藏
Resource-constrained project scheduling:: A critical activity reordering heuristic
资源受限的项目调度:: 关键活动重新排序启发式
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2003-09-01
98
PRE
AI
Valls, V; Quintanilla, S; Ballestín, F
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
E
Erik Demeulemeester
H 指数: 55 · 论文数: 352
Ν
Ν. Trautmann
H 指数: 52 · 论文数: 634
W
Willy Herroelen
H 指数: 42 · 论文数: 221
R
Rosa Blanco
H 指数: 35 · 论文数: 145
R
Roel Leus
H 指数: 31 · 论文数: 259
查看更多