arrow
返回

A mark-based hierarchical asynchronous temporal constraints reasoning algorithm for multi-agent mission planning

delete2024-09-01
delete0
PRE
AI
B
Bang Wang
徐瑞 封面图
徐瑞 (Rui Xu)
D
Deng-Yun Yu
李照宇 封面图
李照宇 (Zhaoyu Li) *
S
Siyao Lu
DOI:10.1016/j.eswa.2024.123624delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The establishment of a lunar base requires the collaborative cooperation of multiple lunar rovers. The efficiency of rovers' mission planning can be increased by quickly determining whether the numerous temporal constraints between the activities of rovers are consistent. This research focuses on constructing a new and efficient algorithm to solve the complex temporal constraint problem in mission planning for lunar rovers. A mark -based centralized arc -consistency algorithm is proposed to filter unnecessary constraint checks depending on whether the mark of each variable changes. It improves computational efficiency and we prove the rationality of the algorithm theoretically. Then, based on the algorithm mentioned above, a mark -based hierarchical asynchronous algorithm is proposed to reduce the iterations of temporal constraints reasoning through asynchronous computation. At the same time, each rover tightens its local variables' domains to a minimum before interacting with other rovers, which reduces the impact of locally shared variables on the outside. This avoids the problem of reduced computational efficiency caused by the waiting time of asynchronous computing. Finally, we conduct comprehensive experiments on different types of benchmark datasets, and the results show that the mark -based hierarchical asynchronous algorithm can improve efficiency by up to 47.64 % and reduce the number of constraint checks by up to 89.26 % compared to existing algorithms, which also benefits to reduce the number of communication messages and iterations.
Keyword:
Multi -agent
Lunar rovers
Hierarchical asynchronous
Arc -consistency
Simple temporal problem

期刊

Expert Systems with Applications 封面图
Expert Systems with Applications
IF:
7.5
论文数:
3.0W
被引数:
10.2W

机构

B
beijing institute of technology
学者数:
5.5W
论文数: 4.0W
被引数: 63
引用论文

引用论文

Hierarchical multi-agent planning for flexible assembly of large-scale lunar facilities
err2023-01-01
err9
PREAI
errXu, Rui; Zhao, Yuting; Li, Zhaoyu; Zhu, Shengying; Liang, Zixuan; Gao, Yue
err分享
err收藏
MAPGEN: Mixed-initiative planning and scheduling for the mars exploration rover mission
err2004-01-01
err121
PREAI
errAi-Chang, M; Bresina, J; Charest, L; Chase, A; Hsu, JCJ; Jonsson, A; Kanefsky, B; Morris, P; Rajan, K; Yglesias, J; Chafin, BG; Dias, WC; Maldague, PF
err分享
err收藏
Temporal reasoning and query answering with preferences and probabilities for medical decision support
err2022-06-01
err5
PREAI
errAndolina, Antonella; Guazzone, Marco; Piovesan, Luca; Terenziani, Paolo
err分享
err收藏
err分享
err收藏
Integrating Temporal Planning and Knowledge Representation to Generate Personalized Touristic Itineraries
err2025-01-01
err0
PREAI
errSilvia Gola; Donatella Capaldi; Alessandra Chivirì; Mohamed Ali Jaziri; Laura Leopardi; Saverio Giulio Malatesta; Irene Muci; Andrea Orlandini; Alessandro Umbrico; Alberto Bucciero
err分享
err收藏
学者 查看更多内容