arrow
返回

A network flow model for the capacitated lot-sizing problem

delete1999-04-01
delete22
PRE
AI
P
Paulo Morelato França
F
Franklina M. B. Toledo
DOI:10.1016/S0305-0483(98)00045-0delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The lot-sizing problem considered in this paper consists in planning the production of multiple items on a single machine over a finite planning horizon divided into time periods. The objective of the problem is to determine a minimum cost production plan that meets the forecast demand for the items. The mathematical model considers setup time and setup cost, and is represented as a minimum cost network how problem. A branch-and-bound method is proposed for solving the model.:The performance of the method is evaluated by using numerical experiments for various demand patterns and values of cost parameters. (C) 1999 Elsevier Science Ltd. All rights reserved.
Keyword:
production planning
lot-sizing
network flows
branch-and-bound
setup time
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

O
Omega-International Journal of Management Science
IF:
7.2
论文数:
3.7K
被引数:
1.4W

机构

暂无机构信息
引用论文

引用论文

Electron Beam Action and High Charging of Dust Particles
err2018-04-01
err0
PREAI
errSergey I. Kopnin; Tatiana I. Morozova; Sergey I. Popel
err分享
err收藏
err分享
err收藏
err分享
err收藏
err分享
err收藏
学者 查看更多内容