科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
P
Paulo Morelato França
Universidade Estadual Paulista
28
H指数
97
论文数
2.2K
被引数
0
相关解读
订阅
收录论文
20
发表时间
发表时间
IF
被引数
A genetic algorithm/mathematical programming approach to solve a two-level soft drink production problem
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2014-08-01
36
PRE
AI
Motta Toledo, Claudio Fabiano; de Oliveira, Lucas; Pereira, Rodrigo de Freitas; Franca, Paulo Morelato; Morabito, Reinaldo
分享
收藏
GRASP with evolutionary path-relinking for the capacitated arc routing problem
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2013-12-01
48
OA
AI
Usberti, Fabio Luiz; Franca, Paulo Morelato; Morelato Franca, Andre Luiz
分享
收藏
A hybrid multi-population genetic algorithm applied to solve the multi-level capacitated lot sizing problem with backlogging
一种混合多种群遗传算法,用于解决积压的多级产能批量问题
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2013-04-01
52
OA
AI
Motta Toledo, Claudio Fabiano; Ribeiro de Oliveira, Renato Resende; Franca, Paulo Morelato
分享
收藏
An iterated sample construction with path relinking method: Application to switch allocation in electrical distribution networks
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2013-01-01
15
PRE
AI
Benavides, Alexander J.; Ritt, Marcus; Buriol, Luciana S.; Franca, Paulo M.
分享
收藏
The open capacitated arc routing problem
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2011-11-01
28
OA
AI
Usberti, Fabio Luiz; Franca, Paulo Morelato; Morelato Franca, Andre Luiz
分享
收藏
A linear optimization approach to the combined production planning model
JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS
IF
3.7
2011-09-01
30
PRE
AI
Gramani, Maria Cristina N.; Franca, Paulo M.; Arenales, Marcos N.
分享
收藏
Two-level network design with intermediate facilities: An application to electrical distribution systems
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
IF
7.2
2011-01-01
40
PRE
AI
Costa, Alysson M.; Franca, Paulo M.; Lyra Filho, Christiano
分享
收藏
Comparing meta-heuristic approaches for parallel machine scheduling problems
PRODUCTION PLANNING & CONTROL
IF
5.4
2010-11-15
43
PRE
AI
Mendes, AS; Müller, FM; França, PM; Moscato, P
分享
收藏
A Lagrangian relaxation approach to a coupled lot-sizing and cutting stock problem
拉格朗日松弛方法解决批量大小和切割库存问题
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2009-06-01
51
PRE
AI
Gramani, M. C. N.; Franca, P. M.; Arenales, M. N.
分享
收藏
Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2009-04-09
68
OA
AI
Toledo, C. F. M.; Franca, P. M.; Morabito, R.; Kimms, A.
分享
收藏
Multiobjective service restoration in electric distribution networks using a local search based heuristic
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2008-09-01
12
PRE
AI
Garcia, Vinicius Jacques; Franca, Paulo Morelato
分享
收藏
The combined cutting stock and lot-sizing problem in industrial processes
工业过程中的联合切割库存和批量问题
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2006-10-01
64
PRE
AI
Gramani, Maria Cristina N.; Franca, Paulo M.
分享
收藏
Genetic algorithms for the no-wait flowshop sequencing problem with time restrictions
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2006-03-01
23
PRE
AI
França, PM; Tin, G; Buriol, LS
分享
收藏
Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2005-05-01
105
PRE
AI
França, PM; Gupta, JND; Mendes, AS; Moscato, P; Veltink, KJ
分享
收藏
A memetic algorithm for the total tardiness single machine scheduling problem
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2001-07-01
142
PRE
AI
França, PM; Mendes, A; Moscato, P
分享
收藏
A network flow model for the capacitated lot-sizing problem
容量限制批量问题的网络流模型
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
IF
7.2
1999-04-01
22
PRE
AI
Armentano, VA; França, PM; de Toledo, FMB
分享
收藏
A heuristic method for lot-sizing in multi-stage systems
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
1997-09-01
33
PRE
AI
Franca, PM; Armentano, VA; Berretta, RE; Clark, AR
分享
收藏
A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times
具有序列相关设置时间的多处理器调度问题的禁忌搜索启发式方法
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
1996-06-01
90
PRE
AI
Franca, PM; Gendreau, M; Laporte, G; Muller, FM
分享
收藏
THE M-TRAVELING SALESMAN PROBLEM WITH MINMAX OBJECTIVE
TRANSPORTATION SCIENCE
IF
4.8
1995-08-01
70
PRE
AI
FRANCA, PM; GENDREAU, M; LAPORTE, G; MULLER, FM
分享
收藏
SOLVING STOCHASTIC TRANSPORTATION-LOCATION PROBLEMS BY GENERALIZED BENDERS DECOMPOSITION
TRANSPORTATION SCIENCE
IF
4.8
1982-05-01
39
PRE
AI
FRANCA, PM; LUNA, HPL
分享
收藏
研究方向
暂无研究方向
合作学者
合作期刊
G
Gilbert Laporte
H 指数: 129 · 论文数: 855
M
Michel Gendreau
H 指数: 93 · 论文数: 628
J
Jatinder N.D. Gupta
H 指数: 60 · 论文数: 351
R
Reinaldo Morábito
H 指数: 46 · 论文数: 314
P
Pablo Moscato
H 指数: 40 · 论文数: 260
查看更多