In multi-project management, effectively allocating limited resources to projects is crucial for ensuring the success of the project portfolio and timely delivery. There are two approaches to managing renewable resources based on project execution environment and resource characteristics: resource sharing and resource dedication. This study explores a novel resource dedication-transfer policy, where renewable resources are dedicated to each project during execution and can be transferred to other projects once the corresponding project is completed. Additionally, real-world multi-project scheduling often faces uncertainties, with the most common issue being varying durations of activities. To address this, a hierarchical multi-objective optimization model is proposed under the resource dedication-transfer policy. This model aims to allocate dedicated resources to the project portfolio at a tactical level and schedule individual activities at an operational level. The specific objectives include minimizing the total weighted tardiness of all projects, minimizing the total fluctuating costs of resources, and maximizing solution robustness in the presence of activity duration variabilities. The proposed solution methodologies include an adjusted large neighborhood search (ALNS) and a customized NSGA-II algorithm. Both algorithms employ a hybrid coding scheme of project-buffer-resource-activity list to represent feasible solutions. Specially, the ALNS introduces new destroy-repair neighborhood operators and a hypervolume-based selection criterion to enhance its performance. Experimental results demonstrate that while both algorithms have their advantages for small-scale instances, the ALNS is more effective for large-scale instances. Finally, the derived Pareto solutions from the proposed method are further evaluated through a simulation of multi-project execution under different levels of activity duration variabilities.
Keyword:
Multi-project scheduling
Resource dedication
Resource transfer
Duration uncertainties
Multi-objective optimization
Adjusted large neighborhood search

期刊

Annals of Operations Research 封面图
Annals of Operations Research
IF:
4.5
论文数:
8.1K
被引数:
2.1W

机构

Z
zhongnan university of economics & law
学者数:
2.0K
论文数: 2.2K
被引数: 3
H
hunan university
学者数:
4.5W
论文数: 3.3W
被引数: 70
N
national university of defense technology - china
学者数:
1.8W
论文数: 1.4W
被引数: 9
学者 查看更多机构
引用论文

引用论文

L'épargnant au bord de la crise
err2012-12-01
err0
errOAAI
errLuc Arrondel; Vladimir Borgy; Frédérique Savignac
err分享
err收藏
Additive effects of orchiectomy and intermittent hypoxia on lung mechanics and inflammation in C57BL/6J male mice
err2021-11-23
err0
errOAAI
errGauthier Ganouna‐Cohen; Fatemeh Khadangi; François Marcouiller; Ynuk Bossé; Vincent Joseph
err分享
err收藏
err分享
err收藏
Interval Multiobjective Optimization With Memetic Algorithms
err2020-08-01
err114
PREAI
errSun, Jing; Miao, Zhuang; Gong, Dunwei; Zeng, Xiao-Jun; Li, Junqing; Wang, Gaige
err分享
err收藏
err分享
err收藏
Fast Rydberg antiblockade regime and its applications in quantum logic gates
err2017-02-13
err0
PREAI
errShi-Lei Su; Ya Gao; Erjun Liang; Shou Zhang
err分享
err收藏
err分享
err收藏
学者 查看更多内容