arrow
返回

An adaptive path selection method for delay testing

delete2001-01-01
delete6
PRE
AI
W
Wen-Ben Jone *
W
Wu-Sung Yeh
Y
Yeh, CW
D
Das, SR
DOI:10.1109/19.963168delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
For verifying the correctness of a circuit, not only its logic function, but also its timing behavior must be considered. Although the path delay fault model can handle part of the weakness of the gate delay fault model, it also has inherent deficiencies. Since the number of paths in a logic circuit is tremendous, exhaustively testing each signal propagation path is prohibitive. To deal with the weakness of traditional delay test techniques, based on the path delay fault model, a new delay test approach including a new delay test output observation method and an adaptive path selection method is proposed in this work. The basic idea of the approach is to measure the signal transition time for each delay test, and more paths are selected for a second-stage test (if necessary) to ensure the timing behavior of the circuit under test. Experimental results obtained by computer simulation demonstrate that a more thorough test is really a need if many significantly late signal transitions are observed.
Keyword:
delay testing
long path selection
new path construction
path delay fault model
path segmentation
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

IEEE Transactions on Instrumentation and Measurement 封面图
IEEE Transactions on Instrumentation and Measurement
IF:
5.9
论文数:
2.0W
被引数:
5.8W

机构

暂无机构信息
引用论文

引用论文

Report on the 2nd World Congress on Fetal Origins of Adult Disease, Brighton, U.K., June 7–10, 2003
err2004-05-01
err0
errOAAI
errMark Hanson; Peter Gluckman; Dennis Bier; John Challis; Tom Fleming; Terrence Forrester; Keith Godfrey; Penelope Nestel; Chittaranjan Yajnik
err分享
err收藏
A consistent approach to platelet transfusion in the NICU
err2012-10-02
err0
PREAI
errAntonio Del Vecchio; Mario Motta; Maurizio Radicioni; Robert D. Christensen
err分享
err收藏
没有更多内容