Application framework for safety-centric construction acceleration planning

delete2022-01-24
delete2
PRE
AI
S
Samin Mahdavian
M
Ming Lu *
E
Estacio Pereira
DOI:10.1108/ECAM-03-2021-0195delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Purpose Previous research regarding shaping factors and major causes behind accidents in the construction field is reviewed. In particular, a hypothetical model is established to correlate activity time, cost and safety in the context of construction activity acceleration planning. Two demonstration cases are presented to illustrate the proposed theoretical model in the context of critical activity expedition planning. Further, a third case uses a 100-activity project to perform the global level total project time and cost analysis, identifying specific activity acceleration plans that would materialize the shortened total project time at the lowest total project cost. Design/methodology/approach This research proposes a safety-centric application framework to guide construction acceleration planning at both activity and project levels while taking sufficient preventive measures against safety hazards and accidents. As planning construction acceleration by factoring in safety constraints inevitably drives up cost, it is imperative to control increases in activity costs at the local level in connection with schedule acceleration planning while at the same time not compromising on safety. This research also addresses this critical question through performing global level total project time and cost analysis. Findings An application framework is proposed for guiding a planner through identifying accident shaping factors, obeying schedule acceleration rules and accounting for safety-related costs in attempts to mitigate hazardous situations on-site at both activity level (local) and project level (global), resulting in (1) minimizing the increase of total project cost in schedule acceleration while at the same time not compromising on safety at individual activities; (2) producing specific execution plans on each individual activity in terms of the amount of time to crash and the associated activity cost. Originality/value This study is original in developing theories and methods for evaluating the impact of safety constraints upon construction time and cost in activity acceleration planning and project time-cost analysis. The research fills a gap in knowledge in terms of how to factor in sufficient safety constraints while achieving project time and cost objectives on construction acceleration planning at both activity and project levels.
Keyword:
Safety
Project planning
Cost
Schedule
Acceleration
Activity crashing

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

U
University of Calgary
学者数:
3.8W
论文数: 3.3W
被引数: 52
U
university of alberta
学者数:
5.1W
论文数: 4.9W
被引数: 65
引用论文

引用论文

Elucidation of the miniemulsion stabilization mechanism and polymerization kinetics
err2003-10-27
err0
PREAI
errChristopher D. Anderson; E. David Sudol; Mohamed S. El‐Aasser
err分享
err收藏
err分享
err收藏
err分享
err收藏
Toward an understanding of the impact of production pressure on safety performance in construction operations
err2014-07-01
err134
PREAI
errHan, SangUk; Saba, Farzaneh; Lee, SangHyun; Mohamed, Yasser; Pena-Mora, Feniosky
err分享
err收藏
Overall multiobjective optimization of construction projects scheduling using particle swarm
err2016-05-16
err50
PREAI
errElbeltagi, Emad; Ammar, Mohammed; Sanad, Haytham; Kassab, Moustafa
err分享
err收藏
学者 查看更多内容