科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
M
Ming Lu
hong kong polytechnic university
30
H指数
240
论文数
3.6K
被引数
0
相关解读
订阅
收录论文
52
发表时间
发表时间
IF
被引数
Time-cost combined optimization in planning infrastructure construction projects under environment induced time-window constraints
在环境诱发的时窗约束下基础设施建设项目规划的时间-成本组合优化
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
IF
9.1
2025-12-01
0
OA
AI
Naumets, Serhii; Lu, Ming; Qi, Kai
分享
收藏
Integrating posture-hour constraints into construction scheduling to enhance workforce wellbeing
将姿态-小时约束集成到施工计划中,以提升劳动力福祉
Computer-Aided Civil and Infrastructure Engineering
IF
9.1
2025-11-24
0
OA
AI
Kai Qi; Ming Lu
分享
收藏
Optimized crane mat design and transit path planning using a graph search algorithm
基于图搜索算法的优化起重机垫板设计与运输路径规划
AUTOMATION IN CONSTRUCTION
IF
11.5
2025-05-01
0
OA
AI
Hasan, Monjurul; Lu, Ming
分享
收藏
Mitigating Project Schedule Risks by Identifying Subcritical Paths and Variance-Critical Activities
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2024-08-01
0
PRE
AI
Hasan, Monjurul; Lu, Ming
分享
收藏
Investigation of the failure mechanism and theoretical model of bolt-reinforced shallow tunnel faces with different bolt lengths
UNDERGROUND SPACE
IF
8.3
2024-06-01
7
OA
AI
Zhang, Xiao; Yu, Li; Wang, Mingnian; Yang, Henghong; Lu, Ming; Li, Zexing; Tang, Langzhou
分享
收藏
Global Sensitivity Analysis Methodology for Construction Simulation Models: Multiple Linear Regressions versus Multilayer Perceptions
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2024-05-01
2
PRE
AI
Wang, Sida; Hasan, Monjurul; Lu, Ming
分享
收藏
Enhanced model tree for quantifying output variances due to random data sampling: Productivity prediction applications
AUTOMATION IN CONSTRUCTION
IF
11.5
2024-02-01
2
PRE
AI
Hasan, Monjurul; Lu, Ming
分享
收藏
Project Schedule Acceleration Optimization Integrated with Energy Source-Based Assessment of Occupational Health and Safety Risks
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2023-12-01
0
PRE
AI
Siddika, Ayesha; Lu, Ming
分享
收藏
Project Schedule Development under Environment-Induced Time-Window Constraints: Case of Constructing River-Crossing Bridge in Remote Northern Region
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2022-12-01
1
PRE
AI
Naumets, Serhii; Lu, Ming; Ali, Malika
分享
收藏
Application framework for safety-centric construction acceleration planning
construction engineering and management
IF
3.9
2022-01-24
2
PRE
AI
Mahdavian, Samin; Lu, Ming; Pereira, Estacio
分享
收藏
Streamlined project time-cost tradeoff optimization methodology: Algorithm, automation, and application
AUTOMATION IN CONSTRUCTION
IF
11.5
2022-01-01
9
PRE
AI
Nasiri, Sasan; Lu, Ming
分享
收藏
Investigation into Explainable Regression Trees for Construction Engineering Applications
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2021-08-01
13
PRE
AI
Naumets, Serhii; Lu, Ming
分享
收藏
Error Propagation Model for Analyzing Project Labor Cost Budget Risks in Industrial Construction
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2021-04-01
16
PRE
AI
Hasan, Monjurul; Lu, Ming
分享
收藏
Synchronized Optimization of Various Management-Function Schedules in a Multiproject Environment: Case Study of Planning Steel Girder Fabrication Projects in Bridge Construction
在多项目环境中同步优化各种管理功能时间表: 桥梁建设中规划钢梁制造项目的案例研究
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2020-05-01
3
PRE
AI
Liu, Jing; Lu, Ming
分享
收藏
Proposing a lean and green framework for equipment cost analysis in construction
FRONTIERS OF ENGINEERING MANAGEMENT
IF
7.7
2019-05-23
3
PRE
AI
Lu, Ming; Diaz, Nicolas; Hasan, Monjurul
分享
收藏
Integrated optimization of rebar detailing design and installation planning for waste reduction and productivity improvement
AUTOMATION IN CONSTRUCTION
IF
11.5
2019-05-01
38
PRE
AI
Zheng, Chaoyu; Yi, Chaojue; Lu, Ming
分享
收藏
Classical Planning Model-Based Approach to Automating Construction Planning on Earthwork Projects
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
IF
9.1
2018-10-24
14
PRE
AI
Li, Duanshun; Lu, Ming
分享
收藏
Constraint Programming Approach to Optimizing Project Schedules under Material Logistics and Crew Availability Constraints
在物料物流和人员可用性约束下优化项目进度的约束编程方法
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2018-07-01
50
PRE
AI
Liu, Jing; Lu, Ming
分享
收藏
Integrating geometric models, site images and GIS based on Google Earth and Keyhole Markup Language
AUTOMATION IN CONSTRUCTION
IF
11.5
2018-05-01
27
PRE
AI
Li, Duanshun; Lu, Ming
分享
收藏
BIM-based automated design and planning for boarding of light-frame residential buildings
AUTOMATION IN CONSTRUCTION
IF
11.5
2018-05-01
60
PRE
AI
Liu, Hexu; Singh, Gurjeet; Lu, Ming; Bouferguene, Ahmed; Al-Hussein, Mohamed
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
X
Xuemin Shen
H 指数: 149 · 论文数: 2.5K
C
Chi Sun Poon
H 指数: 141 · 论文数: 895
李恒
(Heng Li)
H 指数: 110 · 论文数: 2.0K
张
张建萍
(Jianping Zhang)
H 指数: 78 · 论文数: 910
刘
刘京
(Jing Liu)
H 指数: 69 · 论文数: 4.1K
查看更多