摘要

摘要

En 中文
We consider bi-objective parallel-machine scheduling in green manufacturing to minimize the makespan and total processing cost. Each machine has a different constant processing cost per unit time. For the objective of minimizing the makespan, given a total cost budget, we provide an approximation algorithm with a worst-case ratio of root 33+1/4 approximate to 1.686, which improves the previous bound of 2. For the objective of minimizing the total processing cost, subject to all the jobs must be completed before a given common deadline, we provide an approximation algorithm with a worst-case ratio of 2+r/3, where r is the ratio of the maximum to the minimum processing cost per unit time on a machine.
Keyword:
Green manufacturing
Parallel-machine scheduling
Approximation algorithm
Worst-case ratio

期刊

Computers and Industrial Engineering 封面图
Computers and Industrial Engineering
IF:
6.5
论文数:
1.0W
被引数:
3.8W

机构

H
hefei university of technology
学者数:
2.5W
论文数: 1.7W
被引数: 35
Z
Zhejiang Gongshang University
学者数:
6.6K
论文数: 4.9K
被引数: 8.1K
引用论文

引用论文

A multi-level optimization approach for energy-efficient flexible flow shop scheduling
err2016-11-01
err114
PREAI
errYan, Jihong; Li, Lin; Zhao, Fu; Zhang, Fenyang; Zhao, Qingliang
err分享
err收藏
Thermo – Photo – Voltaic Generator Development
err2014-01-01
err0
errOAAI
errClaudio Ferrari; Francesco Melino
err分享
err收藏
err分享
err收藏
err分享
err收藏
err分享
err收藏
err分享
err收藏
学者 查看更多内容