返回
摘要
En 中文
In this paper, we propose 260 randomly generated scheduling problems whose size is greater than that of the rare examples published. Such sizes correspond to real dimensions of industrial problems. The types of problems that we propose are: the permutation flow shop, the job shop and the open shop scheduling problems. We restrict ourselves to basic problems: the processing times are fixed, there are neither set-up times nor due dates nor release dates, etc. Then, the objective is the minimization of the makespan.
Keyword:
COMBINATORIAL OPTIMIZATION
SCHEDULING
BENCHMARKS
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
6.4W
机构
暂无机构信息
引用论文
Adsorption of Cu(II), Pb(II), and Cd(II) Ions from Acidic Aqueous Solutions by Diethylenetriaminepentaacetic Acid-Modified Magnetic Graphene Oxide二乙烯三胺五乙酸改性的磁性氧化石墨烯对酸性水溶液中Cu(II),Pb(II) 和Cd(II) 离子的吸附
Effect of calcination temperature on the properties of CZTS absorber layer prepared by RF sputtering for solar cell applications煅烧温度对射频溅射制备的CZTS吸收层性能的影响
没有更多内容

