返回
Benchmarks for shop scheduling problems
DOI:10.1016/S0377-2217(97)00019-2.png)
摘要
En 中文
In this paper we present extensive sets of randomly generated test problems for the problems of minimizing makespan (C-max) and maximum lateness (L-max) in flow shops and job shops. The 600 problems include three different types of routings, four different due date configurations and a variety of problem sizes. The problems, as well as the best existing solution and a lower bound on the optimal value are available on the world-wide web. (C) 1998 Elsevier Science B.V.
Keyword:
combinatorial optimization
scheduling
benchmarks
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
8.1W
机构
暂无机构信息
引用论文
Diagnostic accuracy of BRCA1-associated protein 1 in malignant mesothelioma: a meta-analysis
Oncotarget
IF0

