返回
BIM-based schedule generation and optimization using genetic algorithms
DOI:10.1016/j.autcon.2024.105476.png)
摘要
En 中文
This research presents a transformative framework to tackle challenges within the construction industry, where efficiency is hindered by limited digitalization and disjointed project phases. The framework seamlessly integrates state-of-the-art technologies, such as Building Information Modeling (BIM), Genetic Algorithms (GAs) for schedule optimization, 5D simulation, and a Business Intelligence (BI) Dashboard. By doing so, it effectively enhances productivity while bridging the gap between the realms of management and engineering. A comprehensive literature review underpins the framework's design, focusing mainly on BIM-based schedule generation and optimization. The approach's validity is demonstrated through a compelling case study, showcasing automated BIM model creation, BIM-Based schedule generation limited to structural elements of bottom-up Cast-insitu construction method, GAs-driven schedule optimization, 5D project simulation, and the integration of the BI dashboard. This research propels operational efficiency and promotes harmonious integration with pre-existing software systems, thus facilitating smoother adoption and adaptation.
Keyword:
Building information modeling (BIM)
Automation
Genetic algorithm
Automatic Scheduling
Construction
Optimization
Integrated project delivery (IPD)
5D simulation
期刊
IF:
11.5
论文数:
6.2K
被引数:
4.2W
机构
引用论文
Antioxidant Properties and Gastroprotective Effects of 2-(Ethylthio)Benzohydrazones on Ethanol-Induced Acute Gastric Mucosal Lesions in Rats
PLOS ONE
IF0

