Construction project scheduling under workspace interference
DOI:10.1111/mice.12547.png)
摘要
En 中文
Workspace interference in construction sites usually leads to work inefficiency, rework, and risk to the workforce. In this paper, we present a study on controlling and mitigating workspace interference in construction project scheduling. In particular, we consider two types of workspace interference: unacceptable workspace interference (USI) and acceptable workspace interference (ASI). During the scheduling process, if two activities cause USI, they must be scheduled for non-overlapping execution periods. If the two activities that cause ASI are executed concurrently, it will lead to decrease in productivity. We first establish a mathematical model for construction project scheduling subject to these two types of workspace interference. This established model is a mixed-integer, multiobjective optimization problem. Then, a two-stage metaheuristic algorithm is developed to solve the problem. Two construction scenarios are selected to illustrate the effectiveness of the proposed method. By comparing with traditional forward scheduling method, the two-stage metaheuristic algorithm can achieve solutions with, on average, shorter project makespan, less total cost as well as milder resource usage variation in execution.
Keyword:
NEURAL DYNAMICS MODEL
TRADE-OFF ANALYSIS
MULTIOBJECTIVE OPTIMIZATION
DISCRETE-TIME
COST
ALGORITHM
MANAGEMENT
SPACE
REQUIREMENTS
SCHEMES
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
C
IF:
9.1
论文数:
2.0K
被引数:
10.0K
机构
引用论文
Framework for Work-Space Planning Using Four-Dimensional BIM in Construction Projects在建筑项目中使用四维BIM的工作空间规划框架