Construction rescheduling based on a manufacturing rescheduling framework

delete2009-10-01
delete25
PRE
AI
S
Shu‐Shun Liu *
K
Kuo‐Chuan Shih
DOI:10.1016/j.autcon.2009.02.002delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Changes during project execution frequently require schedule updating and rescheduling. However. few studies have discussed rescheduling issues or implemented rescheduling solutions for construction projects. This study investigates resource-constrained construction rescheduling issues using concepts associated with manufacturing rescheduling. Based on an initial schedule and actual progress, a novel rescheduling optimization model using Constraint Programming (CP) techniques is developed to reschedule projects. Two rescheduling methods: (1) complete regeneration (CR): and, (2) partial rescheduling (PR) while minimizing overall project variation are implemented in the proposed model to demonstrate the model capability and applications. PR requiring additional treatments to decrease overall project variation is performed using a novel constraint-release mechanism. Finally, using a case study, optimization results obtained using two rescheduling methods are analyzed and discussed. (C) 2009 Elsevier B.V. All rights reserved.
Keyword:
Construction project scheduling
Resource-constrained project scheduling
Rescheduling
Constraint Programming

期刊

Automation in Construction 封面图
Automation in Construction
IF:
11.5
论文数:
6.3K
被引数:
4.2W

机构

N
national yunlin university science & technology
学者数:
3.2K
论文数: 3.3K
被引数: 1
引用论文

引用论文

Thermotherapy of potato leafroll
err1962-12-01
err0
PREAI
errK. H. Fernow; L. C. Peterson; R. L. Plaisted
err分享
err收藏
Testosterone is associated with the cardiovascular autonomic response to a stressor in healthy men
err2014-07-22
err0
PREAI
errSharanya Ramesh; Stephen B. Wilton; Jayna M. Holroyd-Leduc; Tanvir C. Turin; Darlene Y. Sola; Sofia B. Ahmed
err分享
err收藏
err分享
err收藏