科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
S
Shu‐Shun Liu
national yunlin university science & technology
12
H指数
29
论文数
716
被引数
0
相关解读
订阅
收录论文
12
发表时间
发表时间
IF
被引数
Optimization Model of Maintenance Scheduling Problem for Heritage Buildings with Constraint Programming
基于约束规划的文物建筑维修调度优化模型
BUILDINGS
IF
3.1
2023-07-23
0
OA
AI
Liu, Shu-Shun; Utami, Putri; Budiwirawan, Agung; Arifin, Muhammad Faizal Ardhiansyah; Perdana, Fernanda Sarwatatwadhika
分享
收藏
An Integrated Optimization Model for Life Cycle Pavement Maintenance Budgeting Problems
IEEE ACCESS
IF
3.6
2022-01-01
6
OA
AI
Liu, Shu-Shun; Arifin, Muhammad Faizal Ardhiansyah; Chen, Wei Tong
分享
收藏
Relationships between Social Support, Social Status Perception, Social Identity, Work Stress, and Safety Behavior of Construction Site Management Personnel
SUSTAINABILITY
IF
3.3
2021-03-14
19
OA
AI
Huang, Ying-Hua; Sung, Chen-Yu; Chen, Wei Tong; Liu, Shu-Shun
分享
收藏
Preventive Maintenance Model for National School Buildings in Indonesia Using a Constraint Programming Approach
SUSTAINABILITY
IF
3.3
2021-02-09
7
OA
AI
Liu, Shu-Shun; Faizal Ardhiansyah Arifin, Muhammad
分享
收藏
MEASURING THE PERCEPTION OF SAFETY AMONG TAIWAN CONSTRUCTION MANAGERS
management in engineering
IF
3.7
2013-01-16
18
OA
AI
Chen, Wei Tong; Lu, Chun Sheng; Liu, Shu-Shun; Wang, Min-Shun
分享
收藏
ANALYZING RELATIONSHIPS AMONG SUCCESS VARIABLES OF CONSTRUCTION PARTNERING USING STRUCTURAL EQUATION MODELING: A CASE STUDY OF TAIWAN'S CONSTRUCTION INDUSTRY
management in engineering
IF
3.7
2012-11-20
36
OA
AI
Chen, Wei Tong; Chen, Tung-Tsan; Lu, Chun Sheng; Liu, Shu-Shun
分享
收藏
Optimizing linear project scheduling with multi-skilled crews
使用多技能人员优化线性项目调度
AUTOMATION IN CONSTRUCTION
IF
11.5
2012-07-01
80
PRE
AI
Liu, Shu-Shun; Wang, Chang-Jung
分享
收藏
Optimizing project selection and scheduling problems with time-dependent resource constraints
与时间相关的资源约束优化项目选择和调度问题
AUTOMATION IN CONSTRUCTION
IF
11.5
2011-12-01
67
PRE
AI
Liu, Shu-Shun; Wang, Chang-Jung
分享
收藏
Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow
考虑现金流的多项目调度问题的利润优化
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2010-12-01
49
PRE
AI
Liu, Shu-Shun; Wang, Chang-Jung
分享
收藏
Construction rescheduling based on a manufacturing rescheduling framework
AUTOMATION IN CONSTRUCTION
IF
11.5
2009-10-01
25
PRE
AI
Liu, Shu-Shun; Shih, Kuo-Chuan
分享
收藏
Resource-constrained construction project scheduling model for profit maximization considering cash flow
考虑现金流的资源受限建设项目利润最大化调度模型
AUTOMATION IN CONSTRUCTION
IF
11.5
2008-11-01
93
PRE
AI
Liu, Shu-Shun; Wang, Chang-Jung
分享
收藏
Optimization model for resource assignment problems of linear construction projects
线性建设项目资源分配问题的优化模型
AUTOMATION IN CONSTRUCTION
IF
11.5
2007-07-01
59
PRE
AI
Liu, Shu-Shun; Wang, Chang-Jung
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
W
Wei Tong Chen
H 指数: 24 · 论文数: 95
Y
Ying‐Hua Huang
H 指数: 17 · 论文数: 54
C
Chen-Yü Sung
H 指数: 9 · 论文数: 28
T
Tung-Tsan Chen
H 指数: 9 · 论文数: 30
C
Chang‐Jung Wang
H 指数: 6 · 论文数: 14
查看更多