arrow
返回

Critical-path-analysis-based dynamic component supplier optimization

delete2005-12-01
delete5
PRE
AI
X
Xiaogang Huang
Y
Y.S. Wong
L
Liu, ZJ
Z
Z. M. Qiu
DOI:10.1080/09511920500324290delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The global market today demands rapid introduction of products while maintaining high quality and minimal costs. To accomplish the goals in a timely and efficient manner, companies are considering the power of collaboration across the product lifecycle. This paper proposes a critical-path-analysis (CPA)-based method to optimize the component supplier selection in a dynamic collaborative environment. An objective function is advanced to formalize the component supplier optimization problem. Fuzzy factors, fuzzy decision of the optimization and their relations are analysed. A CPA-based optimization algorithm is developed to select a set of suppliers that could provide the components at low prices and in time.
Keyword:
dynamic collaboration
component supplier optimization
critical path analysis
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

I
International Journal of Computer Integrated Manufacturing
IF:
4
论文数:
2.3K
被引数:
3.4K

机构

暂无机构信息
引用论文

引用论文

err分享
err收藏
学者 查看更多内容