arrow
返回

Customized particle swarm optimization for harmonizing multi-section construction projects

delete2024-06-01
delete2
PRE
AI
M
Michał Tomczak *
P
Piotr Jaśkowski
DOI:10.1016/j.autcon.2024.105359delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Scheduling repetitive construction projects is a challenge due to computational complexity. The authors aim to construct a scheduling system to facilitate the optimization of such projects. First, they formulate a mathematical model of a project composed of any combination of units to be delivered in a fixed order or whose order is to be optimized. With ancillary variables added to the project network, the model proves simple enough to facilitate computations related to schedule optimization. A particle swarm optimization (PSO) algorithm with a unique method to prevent stagnation of the results is proposed to solve the bi-criteria schedule optimization problem. The resulting scheduling system is tested on an actual project to expand an intermodal terminal. The results point to the practical potential of the system. Complemented with a user-friendly interface, it is a ready scheduling support tool. Future research may include incorporating more optimization criteria and making the system riskaware.
Keyword:
Construction project management
Construction project scheduling
Repetitive construction projects
Metaheuristic algorithm
Multicriteria optimization
Particle swarm optimization

期刊

Automation in Construction 封面图
Automation in Construction
IF:
11.5
论文数:
6.3K
被引数:
4.2W

机构

Lublin University of Technology 封面图
Lublin University of Technology
学者数:
1.8K
论文数: 2.0K
被引数: 1.5K
引用论文

引用论文

学者 查看更多内容